舉報

會員
GB50967-2014焦化機械設(shè)備安裝規(guī)范(英文版)
最新章節(jié):
20.1 General Requirement
本書為中華人民共和國國家標(biāo)準(zhǔn),由住房城鄉(xiāng)建設(shè)部組織翻譯的英文版,用于對外交流和國內(nèi)對外的合作。中文版已于2014年出版。本規(guī)范適用于冶金焦化煤處理設(shè)備、焦?fàn)t系統(tǒng)、干熄焦系統(tǒng)、煤氣凈化與化產(chǎn)品回收系統(tǒng)機械設(shè)備工程的安裝。共分20章,主要技術(shù)內(nèi)容為:總則,基本規(guī)定,設(shè)備基礎(chǔ)、地腳螺栓和墊板,設(shè)備和材料,堆、取料機,焦?fàn)t護爐鐵件及操作平臺,焦?fàn)t爐下加熱及交換裝置,焦?fàn)t爐頂設(shè)備,焦?fàn)t附屬設(shè)備,推焦機,攔焦機,裝煤車,熄焦車、電機車、焦罐車,干熄焦工藝鋼結(jié)構(gòu)及軌道,干熄焦熄焦槽,干熄焦裝入、排出系統(tǒng)機械設(shè)備,干熄焦氣體循環(huán)系統(tǒng)機械設(shè)備,干熄焦輔助設(shè)備,煤氣凈化及化產(chǎn)品回收設(shè)備,焦化機械設(shè)備試運轉(zhuǎn)及焦?fàn)t熱態(tài)工程。
最新章節(jié)
- 20.1 General Requirement
- 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
- 19.12 Installation of Mechanical Sedimentation Tank
- 19.10 Welding of Tank Equipment
- 19.8 Installation of Vessel Equipment
- 19.7 Site Welding of Vessel Equipment
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 15:22:43
出版社:中國計劃出版社
本書數(shù)字版權(quán)由中國計劃出版社有限公司提供,并由其授權(quán)上海閱文信息技術(shù)有限公司制作發(fā)行
- 20.1 General Requirement 更新時間:2020-09-25 15:28:32
- 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
- 19.12 Installation of Mechanical Sedimentation Tank
- 19.10 Welding of Tank Equipment
- 19.8 Installation of Vessel Equipment
- 19.7 Site Welding of Vessel Equipment
- 19.6 Assembly of Vessel Equipment
- 19.4 Installation of Tower Equipment
- 19.3 Site Welding of Tower Equipment
- 19.2 Assembly of Tower Equipment
- 19.1 General Requirement
- 19 Equipment of Gas Purification and Chemical Recovery
- 18.3 Installation of Demineralized Water Tank
- 18.2 Installation of Elevator Shaft
- 18 Auxiliary Equipment of COQ
- 17.3 Installation of Secondary Deduster
- 17.2 Installation of Primary Deduster
- 17.1 General Requirement
- 17 Mechanical Equipment of Gas Circulating System of COQ
- 16.4 Installation of Discharging Device
- 16.3 Installation of Charging Device
- 16.2 Installation of Lifting Device
- 16.1 Installation of Transverse Tracting Device
- 16 Mechanical Equipment for Charging and Discharging System of COQ
- 15.2 Installation of Air Supply Device
- 15.1 Installation of Shell Body of Quenching Tank
- 15 Quenching Tank of COQ
- 14.4 Installation of Guide Rails of Lifting Headframe
- 14.2 Installation of Quenching Channel Steel Structure
- 14 Process Steel Structure and Rails of Coke Dry Quench
- 8.1 Installation of Gas Headers and Liquid Ammonia Pipes
- 8 Equipment on the Top of Coke Oven
- 6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
- 6.5 Installation of Oven Port Frames and Nog Plate
- 6.4 Installation of Protective Plates
- 6.1 General Requirement
- 6 Protective Iron Parts and Operating Platform of Coke Oven
- 4.2 Material
- 4 Equipment and Material
- 3.3 Anchor Bolts
- 3.2 Datum Line and Datum Mark for Installation of Equipment
- 3.1 Equipment Foundation
- 3 Equipment Foundation,Anchor Bolts and Shim Plates
- 2 Basic Regulation
- 1 General Provisions
- Explanation of Provisions Development
- Explanation of Provisions
- List of Quoted Standards
- Explanation of Wording in This Code
- 20.7 Thermal-state Operation of Coke Oven
- 20.6 Test-run of Gas Purification and Chemical Recovery Unit
- 20.5 Test-run of Dry Quenching Unit
- 20.4 Test-run of Moving Mechanical Equipment
- 20.3 Test-run of Mechanial Equipment of Coke Oven
- 20.2 Test-run of Material Stacker and Reclaimer
- 20.1 General Requirement
- 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
- 19.22 Installation of Pelleter
- 19.21 Installation of Quantitative Barrel Filler
- 19.20 Installation of Material Charger
- 19.19 Installation of Naphthalene Refiner
- 19.18 Installation of Rotary Drum Crystallizer
- 19.17 Installation of Pipe-type Heating Furnace
- 19.16 Installation of Saturator
- 19.15 Installation of Electrical Tar Skimmer
- 19.14 Installation of Gas Primary and Final Cooler
- 19.13 Iinstallation of Centrifugal Separator
- 19.12 Installation of Mechanical Sedimentation Tank
- 19.11 Installation of Heat-exchange Equipment
- 19.10 Welding of Tank Equipment
- 19.9 Installation of Tank Equipment
- 19.8 Installation of Vessel Equipment
- 19.7 Site Welding of Vessel Equipment
- 19.6 Assembly of Vessel Equipment
- 19.5 Installation of Parts of Tower Equipment
- 19.4 Installation of Tower Equipment
- 19.3 Site Welding of Tower Equipment
- 19.2 Assembly of Tower Equipment
- 19.1 General Requirement
- 19 Equipment of Gas Purification and Chemical Recovery
- 18.3 Installation of Demineralized Water Tank
- 18.2 Installation of Elevator Shaft
- 18.1 General Requirement
- 18 Auxiliary Equipment of COQ
- 17.4 Installation of Water Feeding Pre-heater
- 17.3 Installation of Secondary Deduster
- 17.2 Installation of Primary Deduster
- 17.1 General Requirement
- 17 Mechanical Equipment of Gas Circulating System of COQ
- 16.5 Installation of Automatic Para-position Device
- 16.4 Installation of Discharging Device
- 16.3 Installation of Charging Device
- 16.2 Installation of Lifting Device
- 16.1 Installation of Transverse Tracting Device
- 16 Mechanical Equipment for Charging and Discharging System of COQ
- 15.2 Installation of Air Supply Device
- 15.1 Installation of Shell Body of Quenching Tank
- 15 Quenching Tank of COQ
- 14.6 Installation of Cable Guide Frame of Lifting Device
- 14.5 Installation of Rails of Maintenance Cranes
- 14.4 Installation of Guide Rails of Lifting Headframe
- 14.3 Installation of Rails of Lifting Device
- 14.2 Installation of Quenching Channel Steel Structure
- 14.1 General Requirement
- 14 Process Steel Structure and Rails of Coke Dry Quench
- 13.3 Installation of Coke Tank Car
- 13.2 Installation of Electric Locomotive
- 13.1 Installation of Coke Car
- 13 Coke Car,Electric Locomotive and Coke Tank Car
- 12.8 Installation of Dedusting Device of Coal Charger
- 12.7 Installation of Shutters of Covers of Liquid Ammonia Exchange and Risers
- 12.6 Installation of Cover Extracting Device
- 12.5 Installation of Coal Feeding Device
- 12.4 Installation of Coal Hopper
- 12.3 Installation of Steel Structure
- 12.2 Installation of Walking Device
- 12.1 General Requirement
- 12 Coal Charger
- 11.8 Installation of Coke Guide Dedusting Device
- 11.7 Installation of Cleaning Device of Oven Ports
- 11.6 Installation of Cleaning Device of Oven Port Frames
- 11.5 Installation of Port Extracting Device
- 11.4 Installation of Coke Guide Grill
- 11.3 Installation of Steel Structure
- 11.2 Installation of Walking Structure
- 11.1 General Requirement
- 11 Coke Guide
- 10.9 Installation of Cleaning Device of Small Oven Ports
- 10.8 Installation of Coal Leveling Device
- 10.7 Installation of Cleaning Device of Oven Ports
- 10.6 Installation of Cleaning Device of Oven Port Frames
- 10.5 Installation of Port Extracting Device
- 10.4 Installation of Coke Pushing Device
- 10.3 Installation of Steel Structure
- 10.2 Installation of Walking Structure
- 10.1 General Requirement
- 10 Coke Pusher
- 9.6 Installation of Rails of Coke Guide
- 9.5 Installation of Rails of Coke Pusher,Coal Charger and Coke Car
- 9.4 Installation of Scale for Coal Charger of Coal Tower
- 9.3 Installation of Coal Feeding Device of Coal Tower
- 9.2 Installation of Collecting Plates of Wet Quenching Tower
- 9.1 Installation of Test Equipment for Oven Port Repair Station,Coke Pushing Ram and Coal Leveling Bar
- 9 Auxiliary Equipment of Coke Oven
- 8.3 Installation of Guide Pipes for Coke Guide and Coal Charging Dedusting
- 8.2 Installation of Risers and Crossover Mains
- 8.1 Installation of Gas Headers and Liquid Ammonia Pipes
- 8 Equipment on the Top of Coke Oven
- 7.6 Installation of Stack Gate Valve
- 7.5 Installation of Exchange Driving Structure
- 7.4 Installation of Gas Exchanger
- 7.3 Installation of Waste Gas Exchange Shutter
- 7.2 Installation of Regulating Cock,Exchange Cock and Orifice Plate Box
- 7.1 Installation of Gas Main Pipelines,Branch Pipeline and Downspouts
- 7 Heating and Exchange Device under the Coke Oven
- 6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
- 6.7 Installation of Longitudinal and Lateral Bracings
- 6.6 Installation of Oven Ports
- 6.5 Installation of Oven Port Frames and Nog Plates
- 6.4 Installation of Protective Plates
- 6.3 Installation of Small Buckstays
- 6.2 Installation of Buckstays
- 6.1 General Requirement
- 6 Protective Iron Parts and Operating Platform of Coke Oven
- 5.5 Installation of Belt Conveyor,Balance Weight,Anchorage Locker
- 5.4 Installation of Cable Drum
- 5.3 Installation of Reversible Device
- 5.2 Installation of Walking Structure
- 5.1 General Requirement
- 5 Material Stacker and Reclaimer
- 4.2 Material
- 4.1 Equipment
- 4 Equipment and Material
- 3.4 Shim Plates
- 3.3 Anchor Bolts
- 3.2 Datum Line and Datum Mark for Installation of Equipment
- 3.1 Equipment Foundation
- 3 Equipment Foundation,Anchor Bolts and Shim Plates
- 2 Basic Regulation
- 1 General Provisions
- Foreword
- Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權(quán)信息
- 封面
- 封面
- 版權(quán)信息
- Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Basic Regulation
- 3 Equipment Foundation,Anchor Bolts and Shim Plates
- 3.1 Equipment Foundation
- 3.2 Datum Line and Datum Mark for Installation of Equipment
- 3.3 Anchor Bolts
- 3.4 Shim Plates
- 4 Equipment and Material
- 4.1 Equipment
- 4.2 Material
- 5 Material Stacker and Reclaimer
- 5.1 General Requirement
- 5.2 Installation of Walking Structure
- 5.3 Installation of Reversible Device
- 5.4 Installation of Cable Drum
- 5.5 Installation of Belt Conveyor,Balance Weight,Anchorage Locker
- 6 Protective Iron Parts and Operating Platform of Coke Oven
- 6.1 General Requirement
- 6.2 Installation of Buckstays
- 6.3 Installation of Small Buckstays
- 6.4 Installation of Protective Plates
- 6.5 Installation of Oven Port Frames and Nog Plates
- 6.6 Installation of Oven Ports
- 6.7 Installation of Longitudinal and Lateral Bracings
- 6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
- 7 Heating and Exchange Device under the Coke Oven
- 7.1 Installation of Gas Main Pipelines,Branch Pipeline and Downspouts
- 7.2 Installation of Regulating Cock,Exchange Cock and Orifice Plate Box
- 7.3 Installation of Waste Gas Exchange Shutter
- 7.4 Installation of Gas Exchanger
- 7.5 Installation of Exchange Driving Structure
- 7.6 Installation of Stack Gate Valve
- 8 Equipment on the Top of Coke Oven
- 8.1 Installation of Gas Headers and Liquid Ammonia Pipes
- 8.2 Installation of Risers and Crossover Mains
- 8.3 Installation of Guide Pipes for Coke Guide and Coal Charging Dedusting
- 9 Auxiliary Equipment of Coke Oven
- 9.1 Installation of Test Equipment for Oven Port Repair Station,Coke Pushing Ram and Coal Leveling Bar
- 9.2 Installation of Collecting Plates of Wet Quenching Tower
- 9.3 Installation of Coal Feeding Device of Coal Tower
- 9.4 Installation of Scale for Coal Charger of Coal Tower
- 9.5 Installation of Rails of Coke Pusher,Coal Charger and Coke Car
- 9.6 Installation of Rails of Coke Guide
- 10 Coke Pusher
- 10.1 General Requirement
- 10.2 Installation of Walking Structure
- 10.3 Installation of Steel Structure
- 10.4 Installation of Coke Pushing Device
- 10.5 Installation of Port Extracting Device
- 10.6 Installation of Cleaning Device of Oven Port Frames
- 10.7 Installation of Cleaning Device of Oven Ports
- 10.8 Installation of Coal Leveling Device
- 10.9 Installation of Cleaning Device of Small Oven Ports
- 11 Coke Guide
- 11.1 General Requirement
- 11.2 Installation of Walking Structure
- 11.3 Installation of Steel Structure
- 11.4 Installation of Coke Guide Grill
- 11.5 Installation of Port Extracting Device
- 11.6 Installation of Cleaning Device of Oven Port Frames
- 11.7 Installation of Cleaning Device of Oven Ports
- 11.8 Installation of Coke Guide Dedusting Device
- 12 Coal Charger
- 12.1 General Requirement
- 12.2 Installation of Walking Device
- 12.3 Installation of Steel Structure
- 12.4 Installation of Coal Hopper
- 12.5 Installation of Coal Feeding Device
- 12.6 Installation of Cover Extracting Device
- 12.7 Installation of Shutters of Covers of Liquid Ammonia Exchange and Risers
- 12.8 Installation of Dedusting Device of Coal Charger
- 13 Coke Car,Electric Locomotive and Coke Tank Car
- 13.1 Installation of Coke Car
- 13.2 Installation of Electric Locomotive
- 13.3 Installation of Coke Tank Car
- 14 Process Steel Structure and Rails of Coke Dry Quench
- 14.1 General Requirement
- 14.2 Installation of Quenching Channel Steel Structure
- 14.3 Installation of Rails of Lifting Device
- 14.4 Installation of Guide Rails of Lifting Headframe
- 14.5 Installation of Rails of Maintenance Cranes
- 14.6 Installation of Cable Guide Frame of Lifting Device
- 15 Quenching Tank of COQ
- 15.1 Installation of Shell Body of Quenching Tank
- 15.2 Installation of Air Supply Device
- 16 Mechanical Equipment for Charging and Discharging System of COQ
- 16.1 Installation of Transverse Tracting Device
- 16.2 Installation of Lifting Device
- 16.3 Installation of Charging Device
- 16.4 Installation of Discharging Device
- 16.5 Installation of Automatic Para-position Device
- 17 Mechanical Equipment of Gas Circulating System of COQ
- 17.1 General Requirement
- 17.2 Installation of Primary Deduster
- 17.3 Installation of Secondary Deduster
- 17.4 Installation of Water Feeding Pre-heater
- 18 Auxiliary Equipment of COQ
- 18.1 General Requirement
- 18.2 Installation of Elevator Shaft
- 18.3 Installation of Demineralized Water Tank
- 19 Equipment of Gas Purification and Chemical Recovery
- 19.1 General Requirement
- 19.2 Assembly of Tower Equipment
- 19.3 Site Welding of Tower Equipment
- 19.4 Installation of Tower Equipment
- 19.5 Installation of Parts of Tower Equipment
- 19.6 Assembly of Vessel Equipment
- 19.7 Site Welding of Vessel Equipment
- 19.8 Installation of Vessel Equipment
- 19.9 Installation of Tank Equipment
- 19.10 Welding of Tank Equipment
- 19.11 Installation of Heat-exchange Equipment
- 19.12 Installation of Mechanical Sedimentation Tank
- 19.13 Iinstallation of Centrifugal Separator
- 19.14 Installation of Gas Primary and Final Cooler
- 19.15 Installation of Electrical Tar Skimmer
- 19.16 Installation of Saturator
- 19.17 Installation of Pipe-type Heating Furnace
- 19.18 Installation of Rotary Drum Crystallizer
- 19.19 Installation of Naphthalene Refiner
- 19.20 Installation of Material Charger
- 19.21 Installation of Quantitative Barrel Filler
- 19.22 Installation of Pelleter
- 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
- 20.1 General Requirement
- 20.2 Test-run of Material Stacker and Reclaimer
- 20.3 Test-run of Mechanial Equipment of Coke Oven
- 20.4 Test-run of Moving Mechanical Equipment
- 20.5 Test-run of Dry Quenching Unit
- 20.6 Test-run of Gas Purification and Chemical Recovery Unit
- 20.7 Thermal-state Operation of Coke Oven
- Explanation of Wording in This Code
- List of Quoted Standards
- Explanation of Provisions
- Explanation of Provisions Development
- 1 General Provisions
- 2 Basic Regulation
- 3 Equipment Foundation,Anchor Bolts and Shim Plates
- 3.1 Equipment Foundation
- 3.2 Datum Line and Datum Mark for Installation of Equipment
- 3.3 Anchor Bolts
- 4 Equipment and Material
- 4.2 Material
- 6 Protective Iron Parts and Operating Platform of Coke Oven
- 6.1 General Requirement
- 6.4 Installation of Protective Plates
- 6.5 Installation of Oven Port Frames and Nog Plate
- 6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side
- 8 Equipment on the Top of Coke Oven
- 8.1 Installation of Gas Headers and Liquid Ammonia Pipes
- 14 Process Steel Structure and Rails of Coke Dry Quench
- 14.2 Installation of Quenching Channel Steel Structure
- 14.4 Installation of Guide Rails of Lifting Headframe
- 15 Quenching Tank of COQ
- 15.1 Installation of Shell Body of Quenching Tank
- 15.2 Installation of Air Supply Device
- 16 Mechanical Equipment for Charging and Discharging System of COQ
- 16.1 Installation of Transverse Tracting Device
- 16.2 Installation of Lifting Device
- 16.3 Installation of Charging Device
- 16.4 Installation of Discharging Device
- 17 Mechanical Equipment of Gas Circulating System of COQ
- 17.1 General Requirement
- 17.2 Installation of Primary Deduster
- 17.3 Installation of Secondary Deduster
- 18 Auxiliary Equipment of COQ
- 18.2 Installation of Elevator Shaft
- 18.3 Installation of Demineralized Water Tank
- 19 Equipment of Gas Purification and Chemical Recovery
- 19.1 General Requirement
- 19.2 Assembly of Tower Equipment
- 19.3 Site Welding of Tower Equipment
- 19.4 Installation of Tower Equipment
- 19.6 Assembly of Vessel Equipment
- 19.7 Site Welding of Vessel Equipment
- 19.8 Installation of Vessel Equipment
- 19.10 Welding of Tank Equipment
- 19.12 Installation of Mechanical Sedimentation Tank
- 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven
- 20.1 General Requirement 更新時間:2020-09-25 15:28:32