5.4 Installation of Cable Drum
5.4.1 The installation of cable drum shall be in compliance with the following requirements(Figure 5.4.1):
1 The levelness of the drum is adjusted,and allowable deviation shall be 1/1000 of the length of drum;
2 The lateral deviation of the drum on the datum line of the rail is adjusted and is detected at W1 and W2,and allowable deviation shall be 1.0mm.

Figure 5.4.1 Detection figure of cable drum
1-Level gauge;2-Drum;3-Traveling rail;4-Plumb bob
5.4.2 The installation of reel shall be in compliance with the following requirements:
1 The lateral deviation of the reel and the longitudinal datum line of drum is adjusted,and allowable deviation shall be 5.0mm.
2 The perpendicularity of the reel is adjusted,and allowable deviation shall be 2.0mm.
推薦閱讀
- 城市地下空間規劃標準
- DL/T 5528-2017 輸變電工程結算審核報告編制導則
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- DL/T 5492-2014電力工程遙感調查技術規程
- GB 51227-2017 立井鉆井法施工及驗收規范
- GB 50428-2015 油田采出水處理設計規范
- GB/T 51257-2017 液化天然氣低溫管道設計規范
- DL/T 5512-2016 火力發電廠熱工檢測及儀表設計規程
- GB50049-2011小型火力發電廠設計規范(英文版)
- GB 51176-2016 干混砂漿生產線設計規范
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗收規范
- GB50468-2008焊管工藝設計規范(英文版)
- GB 51303-2018 船廠工業地坪設計標準
- 鉆探、井探、槽探操作規程
- GB 51208-2016 人工制氣廠站設計規范