- GB50967-2014焦化機(jī)械設(shè)備安裝規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 115字
- 2020-09-25 15:28:05
7.4 Installation of Gas Exchanger
7.4.1 The allowable deviation of the center lines of exchange oil cylinder and front and rear chain wheels shall be 3.0mm.
7.4.2 The allowable deviation of the stroke of exchange oil cylinder shall be±10.0mm.
7.4.3 The installation of exchange oil cylinder shall be in compliance with the following requirements:
1 The center line of exchange oil cylinder is adjusted,and allowable deviation shall be 2.0mm;
2 The levelness of exchange oil cylinder is adjusted,and allowable deviation shall be 1/500;of the length of oil cylinder;
3 The elevation of exchange oil cylinder is adjusted,and allowable deviation shall be±2.0mm.
推薦閱讀
- GB/T 51338-2018 分布式電源并網(wǎng)工程調(diào)試與驗(yàn)收標(biāo)準(zhǔn)
- 配用電通信技術(shù)及產(chǎn)業(yè)發(fā)展報(bào)告
- GB 51185-2016 煤炭工業(yè)礦井抗震設(shè)計(jì)規(guī)范
- GB/T 50943-2015 海岸軟土地基堤壩工程技術(shù)規(guī)范
- DL/T 5503-2015 直流換流站施工圖設(shè)計(jì)內(nèi)容深度規(guī)定
- GB/T 50441-2016 石油化工設(shè)計(jì)能耗計(jì)算標(biāo)準(zhǔn)
- GB50377-2006選礦機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范(英文版)
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗(yàn)收規(guī)范
- DL/T 5156.1-2015 電力工程勘測(cè)制圖標(biāo)準(zhǔn) 第1部分:測(cè)量
- GB50439-2015煉鋼工程設(shè)計(jì)規(guī)范(英文版)
- DL/T 5505-2015 電力應(yīng)急通信設(shè)計(jì)技術(shù)規(guī)程
- 鐵路罐車清洗設(shè)施設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 50312-2016 綜合布線系統(tǒng)工程驗(yàn)收規(guī)范
- GB 50588-2017 水泥工廠余熱發(fā)電設(shè)計(jì)標(biāo)準(zhǔn)
- GB 50403-2017 煉鋼機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范