官术网_书友最值得收藏!

4.2 Material

4.2.1 Material approach plan shall be formulated in accordance with equipment delivery schedule and construction schedule for organization.

4.2.2 Raw material,standard parts,steel members and semi-finished products shall be subjected to acceptance during approach and shall be in compliance with the following requirements:

1 All quality conformity certificates shall be checked,and models,specifications,textures,quality,quantity and performance of material shall meet the requirements of design documents and current national product standard.

2 Material shall be reinspected in case of re-inspection requirements in design documents and current national standard,and the re-inspection result shall meet the requirements of design documents and current national product standard.

3 The quality of material objects shall be subjected to spot check in proportion,each kind is subjected to spot check by 1% and shall not be less than 5 pieces,and its appearance quality and size deviation shall meet the requirements of current national standard.

4.2.3 Material shall be classified with marking in accordance with varieties,specifications and batch number for stacking and proper keeping,damage and deformation shall be avoided.

4.2.4 The models and specifications of welding material shall meet the requirements of design documents and welding technological document,and the keeping,drying,cleaning,supply,use and recycling of welding material shall meet the requirements of current national standard,product specification and technical documents.

主站蜘蛛池模板: 探索| 铁岭市| 辽宁省| 兰州市| 油尖旺区| 增城市| 大连市| 图片| 哈密市| 元朗区| 遂溪县| 泌阳县| 平潭县| 岳普湖县| 彭阳县| 会宁县| 吉隆县| 东方市| 铁力市| 金川县| 长乐市| 靖安县| 姜堰市| 迭部县| 德州市| 天镇县| 汉川市| 肃宁县| 土默特左旗| 邢台县| 柳州市| 高台县| 房产| 新民市| 霞浦县| 奉节县| 东乌| 济南市| 郯城县| 柘荣县| 新民市|