GB50071-2014小型水力發電站設計規范(英文版)
最新章節:
List of Quoted Standards
本規范適用于新建、擴建和改建的裝機容量為0.5MW~50MW的小型水電站(以下簡稱電站)設計。本規范共18章,主要技術內容包括:總則、水文、工程地質勘察、水利及動能計算、工程布置及建筑物、水利機械及采暖通風、電氣、金屬結構、消防、施工組織設計、建設征地和移民安置、環境保護、水土保持、工程管理、節能、勞動安全與工業衛生、工程概(估)算、經濟評價。
最新章節
- List of Quoted Standards
- Explanation of Wording in This Code
- 18 Economic Evaluation
- 17 Cost Estimation of Project
- 16 Labor Safety and Industrial Sanitation
- 15 Energy Conservation
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 11:11:06
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- List of Quoted Standards 更新時間:2020-09-25 11:21:54
- Explanation of Wording in This Code
- 18 Economic Evaluation
- 17 Cost Estimation of Project
- 16 Labor Safety and Industrial Sanitation
- 15 Energy Conservation
- 14.3 Operation of Project
- 14.2 Project Management Scope and Protection Scope
- 14.1 General Requirements
- 14 Project Management
- 13.2 Soil and Water Conservation
- 13.1 General Requirements
- 13 Soil and water Conservation
- 12.2 Environmental Impact Assessment and Protection
- 12.1 General Requirements
- 12 Environmental Protection
- 11.9 Compensation for Land Requisition and Resettlement
- 11.8 Implementation Planning
- 11.7 Cleaning of Reservoir Area
- 11.6 Handling of Specific Items
- 11.5 Mitigation of Impacts on Towns
- 11.4 Rural Resident Relocation
- 11.3 Inventory of Physical Property
- 11.2 Scope and Standard of Land Requisition
- 11.1 General Requirements
- 11 Land Requisition and Resettlement
- 10.8 Master Schedule of Construction
- 10.7 General Layout of Construction
- 10.6 Construction Facilities
- 10.5 Access and Onsite Transportation
- 10.4 Construction of Main Works
- 10.3 Selection of Borrow and Quarry Areas
- 10.2 Construction Diversion
- 10.1 General Requirements
- 10 Construction Planning
- 9 Fire Protection
- 8.3 Gates,Trash Rack and Hoisting Device for Power Waterway
- 8.2 Sluice Gate and Hoisting Device
- 8.1 General Requirements
- 8 Hydromechanical Structures
- 7.14 Electrical Repairing and Testing
- 7.13 Communication
- 7.12 Video Monitoring System
- 7.11 Power Source for Operation
- 7.10 Electrical Measurement and Instrument Device
- 7.9 Automatic Control System
- 7.8 Relay Protection and Safety Automatic Devices
- 7.7 Cable Selection and Installation
- 7.6 Arrangement of Electrical Equipment
- 7.5 Lighting
- 7.4 Over Voltage Protection and Grounding Device
- 7.3 Auxiliary Power Supply in Powerhouse and at Dam Site
- 7.2 Main Electrical Connection
- 7.1 Access into Grid
- 7 Electrical System
- 6.10 Repair Equipment
- 6.9 Arrangement of Equipment
- 6.8 Overhead Crane
- 6.7 Ventilation
- 6.6 Hydraulic Monitoring System
- 6.5 Oil System
- 6.4 Compressed Air System
- 6.3 Cooling Water Supply and Drainage System
- 6.2 Speed Governing System and Transient Analysis
- 6.1 Selection of Turbine and Generator
- 6 Hydraulic Machinery,Heating and Ventilation
- 5.8 Safety Monitoring Instrumentation
- 5.7 Structures for Navigation
- 5.6 Powerhouse and Switchyard
- 5.5 Water Conveyance Structure
- 5.4 Water Release Structure
- 5.3 Water Retaining Structure
- 5.2 General Layout of Project
- 5.1 General Requirements
- 5 Layout of Project and Hydraulic Structures
- 4.8 Reservoir Operation Mode and Operational Characteristics over Multiple Years
- 4.7 Analysis of Reservoir Sedimentation and Backwater Computation
- 4.6 Selection of Dimensions of Power Waterway and Volume of Daily Regulation Pool
- 4.5 Selection of Installed Capacity and Type of Hydropower Unit
- 4.4 Selection of Normal Water Level and Dead Water Level
- 4.3 Flood Regulation and Selection of Characteristic Flood-Control Levels
- 4.2 Computation of Runoff Regulation
- 4.1 General Requirements
- 4 Computation of Water and Hydropower
- 3.5 Natural Construction Material
- 3.4 Engineering Geology of Hydraulic Structures
- 3.3 Engineering Geology of Reservoirs
- 3.2 Regional Geology
- 3.1 General Requirements
- 3 Engineering Geology Investigation
- 2.6 Automatic Hydrological Telemetry System
- 2.5 Sediment,Evaporation,Ice Regime
- 2.4 Rating Curve
- 2.3 Flood
- 2.2 Runoff
- 2.1 General Requirements
- 2 Hydrology
- 1 General Provisions
- Foreword
- Introduction to English Version
- 中華人民共和國住房和城鄉建設部公告
- 版權信息
- 封面
- 封面
- 版權信息
- 中華人民共和國住房和城鄉建設部公告
- Introduction to English Version
- Foreword
- 1 General Provisions
- 2 Hydrology
- 2.1 General Requirements
- 2.2 Runoff
- 2.3 Flood
- 2.4 Rating Curve
- 2.5 Sediment,Evaporation,Ice Regime
- 2.6 Automatic Hydrological Telemetry System
- 3 Engineering Geology Investigation
- 3.1 General Requirements
- 3.2 Regional Geology
- 3.3 Engineering Geology of Reservoirs
- 3.4 Engineering Geology of Hydraulic Structures
- 3.5 Natural Construction Material
- 4 Computation of Water and Hydropower
- 4.1 General Requirements
- 4.2 Computation of Runoff Regulation
- 4.3 Flood Regulation and Selection of Characteristic Flood-Control Levels
- 4.4 Selection of Normal Water Level and Dead Water Level
- 4.5 Selection of Installed Capacity and Type of Hydropower Unit
- 4.6 Selection of Dimensions of Power Waterway and Volume of Daily Regulation Pool
- 4.7 Analysis of Reservoir Sedimentation and Backwater Computation
- 4.8 Reservoir Operation Mode and Operational Characteristics over Multiple Years
- 5 Layout of Project and Hydraulic Structures
- 5.1 General Requirements
- 5.2 General Layout of Project
- 5.3 Water Retaining Structure
- 5.4 Water Release Structure
- 5.5 Water Conveyance Structure
- 5.6 Powerhouse and Switchyard
- 5.7 Structures for Navigation
- 5.8 Safety Monitoring Instrumentation
- 6 Hydraulic Machinery,Heating and Ventilation
- 6.1 Selection of Turbine and Generator
- 6.2 Speed Governing System and Transient Analysis
- 6.3 Cooling Water Supply and Drainage System
- 6.4 Compressed Air System
- 6.5 Oil System
- 6.6 Hydraulic Monitoring System
- 6.7 Ventilation
- 6.8 Overhead Crane
- 6.9 Arrangement of Equipment
- 6.10 Repair Equipment
- 7 Electrical System
- 7.1 Access into Grid
- 7.2 Main Electrical Connection
- 7.3 Auxiliary Power Supply in Powerhouse and at Dam Site
- 7.4 Over Voltage Protection and Grounding Device
- 7.5 Lighting
- 7.6 Arrangement of Electrical Equipment
- 7.7 Cable Selection and Installation
- 7.8 Relay Protection and Safety Automatic Devices
- 7.9 Automatic Control System
- 7.10 Electrical Measurement and Instrument Device
- 7.11 Power Source for Operation
- 7.12 Video Monitoring System
- 7.13 Communication
- 7.14 Electrical Repairing and Testing
- 8 Hydromechanical Structures
- 8.1 General Requirements
- 8.2 Sluice Gate and Hoisting Device
- 8.3 Gates,Trash Rack and Hoisting Device for Power Waterway
- 9 Fire Protection
- 10 Construction Planning
- 10.1 General Requirements
- 10.2 Construction Diversion
- 10.3 Selection of Borrow and Quarry Areas
- 10.4 Construction of Main Works
- 10.5 Access and Onsite Transportation
- 10.6 Construction Facilities
- 10.7 General Layout of Construction
- 10.8 Master Schedule of Construction
- 11 Land Requisition and Resettlement
- 11.1 General Requirements
- 11.2 Scope and Standard of Land Requisition
- 11.3 Inventory of Physical Property
- 11.4 Rural Resident Relocation
- 11.5 Mitigation of Impacts on Towns
- 11.6 Handling of Specific Items
- 11.7 Cleaning of Reservoir Area
- 11.8 Implementation Planning
- 11.9 Compensation for Land Requisition and Resettlement
- 12 Environmental Protection
- 12.1 General Requirements
- 12.2 Environmental Impact Assessment and Protection
- 13 Soil and water Conservation
- 13.1 General Requirements
- 13.2 Soil and Water Conservation
- 14 Project Management
- 14.1 General Requirements
- 14.2 Project Management Scope and Protection Scope
- 14.3 Operation of Project
- 15 Energy Conservation
- 16 Labor Safety and Industrial Sanitation
- 17 Cost Estimation of Project
- 18 Economic Evaluation
- Explanation of Wording in This Code
- List of Quoted Standards 更新時間:2020-09-25 11:21:54