4.7 Analysis of Reservoir Sedimentation and Backwater Computation
4.7.1 If the ratio of storage capacity to annual sediment volume flowing into the reservoir(hereinafter referred to as“ratio of storage to sediment”)is less than 30,the sedimentation becomes a major issue for the project;therefore,a reservoir sediment regulating mode that aims to release sediment and reduce sedimentation shall be formulated according to the characteristics of flow and sediment,reservoir configuration,scale of releasing flow,and the impact of sedimentation on reservoir inundation and ecoenvironment,etc.If the ratio of storage to sediment is larger than 30,the sedimentation issue is less significant;then,if there are no important and sensitive inundated objects or other facilities in the reservoir,it is not obligatory to consider the impact of sedimentation,nor to study the reservoir sediment regulating mode.
4.7.2 For sediment-laden rivers with relatively large natural sediment concentration,i.e.the mean annual sediment concentration is larger than 1.0kg/m3,the analysis and computation of reservoir settling sediment should be carried out so as to propose the sediment prevention measures for the diversion of the project.
4.7.3 For high-water-head hydropower stations,the allowable concentration of sediment that passes through the turbines shall be proposed.
4.7.4 In the computation of sediment scouring and silting of the reservoir,various methods may be adopted based on the flow and sediment characteristics,the reservoir sediment regulating mode,and hydrological data availability,etc.If there is less data available,the analogous or empirical method may be applied.If more data are available,the mathematical modeling may be used for calculation,while the major parameters shall be calibrated by actually measured figures,to find out the locations and volumes of sedimentation,and its impact on regulated storage capacity,etc.
4.7.5 In the computation of reservoir backwater,the natural water surface profile before construction of the reservoir and the water surface profile of backwater in reservoir within the predicted duration of sedimentation upon completion of the reservoir shall be derived from the design discharge according to the river course conditions,characteristics and operation mode of reservoir.
- 輸變電工程經(jīng)濟(jì)評價導(dǎo)則
- GB/T 51146-2015 硝化甘油生產(chǎn)廢水處理設(shè)施技術(shù)規(guī)范
- GB/T 51338-2018 分布式電源并網(wǎng)工程調(diào)試與驗(yàn)收標(biāo)準(zhǔn)
- GB 51227-2017 立井鉆井法施工及驗(yàn)收規(guī)范
- 加油站在役油罐防滲漏改造工程技術(shù)標(biāo)準(zhǔn)
- GB/T 50943-2015 海岸軟土地基堤壩工程技術(shù)規(guī)范
- GB/T51050-2014鋼鐵企業(yè)能源計量和監(jiān)測工程技術(shù)規(guī)范(英文版)
- GB/T 51331-2018 煤焦化焦油加工工程設(shè)計標(biāo)準(zhǔn)
- GB/T50663-2011核電廠工程水文技術(shù)規(guī)范(英文版)
- 核電站鋼板混凝土結(jié)構(gòu)技術(shù)標(biāo)準(zhǔn)
- GB 51237-2017 火工品試驗(yàn)室工程技術(shù)規(guī)范
- DL/T 5505-2015 電力應(yīng)急通信設(shè)計技術(shù)規(guī)程
- GB 50603-2010 鋼鐵企業(yè)總圖運(yùn)輸設(shè)計規(guī)范(英文版)
- 工業(yè)文化研究(第2輯):紀(jì)念改革開放四十年——中國工業(yè)的大轉(zhuǎn)型
- GB50679-2011煉鐵機(jī)械設(shè)備安裝規(guī)范(英文版)