4.3 Flood Regulation and Selection of Characteristic Flood-Control Levels

4.3.1 In the computation of flood regulation,techno-economic comparison shall be made for the scale of dedicated discharge structures and limit water level during flood season according to the flood control standard of project and downstream flood control requirements,so as to determine the flood season limit level,the design flood level and the check flood level.

4.3.2 The flood control level shall be determined,under the principle of integrating flood control with beneficial uses,through a comprehensive analysis of the impact of different flood control levels on major beneficial goals,downstream flood control,sedimentation,reservoir inundation and project investment,etc.

4.3.3 For cascade reservoirs,the flood control standard,flood control assignment and flood regulation principle of each reservoir in the cascade shall be analyzed so that the flood control operation mode of the designed hydropower station is coordinated with that of other reservoirs in the cascade.

主站蜘蛛池模板: 平定县| 临安市| 门头沟区| 荣成市| 兴化市| 静海县| 原平市| 宽甸| 浪卡子县| 五莲县| 桓仁| 赤壁市| 高雄市| 毕节市| 讷河市| 潞西市| 棋牌| 澄江县| 南丰县| 阜城县| 钦州市| 萨迦县| 阿巴嘎旗| 丰顺县| 宜兰市| 股票| 漠河县| 桦甸市| 依安县| 明水县| 郎溪县| 申扎县| 江孜县| 鄂尔多斯市| 普兰店市| 屏南县| 遂平县| 蒙自县| 永寿县| 江陵县| 额尔古纳市|