2.4 Rating Curve

2.4.1 If there is a hydrometrical gauging station in the vicinity of the dam(plant)site s,upstream or downstream,observation of water level and investigation of flood and low flow levels may be carried out at the dam(plant)site,the slope of water surface in the river reach be analyzed,and the stage-discharge relation of the hydrometrical gauging station after rectification be adopted at the design sections.

2.4.2 If there is no hydrometrical gauging station at the river reach of dam(plant)site,the rating curve at design section shall be calculated by using hydraulic formula according to the longitudinal profile and crosssection diagrams of the river reach and based on the investigated and estimated water surface slopes of flood and low flow.

2.4.3 For the proposed rating curve,it shall be verified by using actually measured and investigated water level and discharge data.

主站蜘蛛池模板: 威宁| 奉化市| 建阳市| 鹤山市| 新津县| 平南县| 中牟县| 永昌县| 改则县| 黄平县| 平阴县| 南郑县| 灌南县| 高阳县| 醴陵市| 阿拉善盟| 渭源县| 云南省| 上高县| 格尔木市| 通化市| 乌鲁木齐市| 沅江市| 文山县| 子长县| 英吉沙县| 汤阴县| 大姚县| 和田市| 麦盖提县| 张家川| 望都县| 循化| 德兴市| 泗阳县| 青河县| 吉林市| 中卫市| 弥渡县| 鹤岗市| 南宫市|