6 Protective Iron Parts and Operating Platform of Coke Oven

6.1 General Requirement

6.1.1 For the installation of coke oven body equipment,two construction technologies of building before installation of buckstays(hearafter referred to as Class A)and installing buckstays before building(hearafter referred to as Class B)may be adopted.

6.1.2 Before the installation of equipment,the measuring result of the previous working procedure is subjected to the check of actual measurement,simultaneously,the longitidinal and lateral center lines of coke oven bank,the center line of the side coking chamber,the installation datum lines of front lines on machine and coke sides and the center line of flue shall be set,and the perpetual central target and datum mark shall be embedded(Figure 6.1.2).

img

Figure 6.1.2 Datum line of coke oven

1-Center line of flue;2-Control line of oven length;3-Longitidinal center line of coke oven;4-Center line of side coking chamber;5-Lateral center line of coke oven

主站蜘蛛池模板: 新沂市| 赤城县| 吕梁市| 五原县| 芷江| 崇文区| 托里县| 宜兰市| 云阳县| 衡东县| 阜阳市| 外汇| 雅安市| 耿马| 蒲城县| 涟源市| 长丰县| 岚皋县| 博兴县| 乳源| 涞水县| 天门市| 区。| 肇庆市| 葫芦岛市| 宜良县| 鄂托克前旗| 论坛| 怀仁县| 崇明县| 嘉兴市| 拉萨市| 鹿泉市| 西安市| 区。| 前郭尔| 盘山县| 长治市| 万全县| 中西区| 鹿泉市|