6 Protective Iron Parts and Operating Platform of Coke Oven

6.1 General Requirement

6.1.1 For the installation of coke oven body equipment,two construction technologies of building before installation of buckstays(hearafter referred to as Class A)and installing buckstays before building(hearafter referred to as Class B)may be adopted.

6.1.2 Before the installation of equipment,the measuring result of the previous working procedure is subjected to the check of actual measurement,simultaneously,the longitidinal and lateral center lines of coke oven bank,the center line of the side coking chamber,the installation datum lines of front lines on machine and coke sides and the center line of flue shall be set,and the perpetual central target and datum mark shall be embedded(Figure 6.1.2).

img

Figure 6.1.2 Datum line of coke oven

1-Center line of flue;2-Control line of oven length;3-Longitidinal center line of coke oven;4-Center line of side coking chamber;5-Lateral center line of coke oven

主站蜘蛛池模板: 山阳县| 云浮市| 徐汇区| 大竹县| 思茅市| 重庆市| 尉犁县| 南川市| 宣汉县| 平度市| 富阳市| 丘北县| 星子县| 津南区| 雷波县| 巴林右旗| 阿城市| 正安县| 洪泽县| 保山市| 蒙山县| 黄山市| 驻马店市| 溧阳市| 瑞昌市| 枝江市| 清流县| 吴堡县| 延边| 大余县| 鹿邑县| 锦屏县| 沂水县| 施秉县| 道孚县| 竹北市| 内丘县| 高碑店市| 莱芜市| 黑山县| 孙吴县|