6 Protective Iron Parts and Operating Platform of Coke Oven

6.1 General Requirement

6.1.1 For the installation of coke oven body equipment,two construction technologies of building before installation of buckstays(hearafter referred to as Class A)and installing buckstays before building(hearafter referred to as Class B)may be adopted.

6.1.2 Before the installation of equipment,the measuring result of the previous working procedure is subjected to the check of actual measurement,simultaneously,the longitidinal and lateral center lines of coke oven bank,the center line of the side coking chamber,the installation datum lines of front lines on machine and coke sides and the center line of flue shall be set,and the perpetual central target and datum mark shall be embedded(Figure 6.1.2).

img

Figure 6.1.2 Datum line of coke oven

1-Center line of flue;2-Control line of oven length;3-Longitidinal center line of coke oven;4-Center line of side coking chamber;5-Lateral center line of coke oven

主站蜘蛛池模板: 营口市| 小金县| 安仁县| 吉木乃县| 徐水县| 娄烦县| 旺苍县| 衡山县| 卢湾区| 图们市| 肃宁县| 镇巴县| 阜南县| 宜兰市| 夏津县| 赞皇县| 牟定县| 鸡东县| 彩票| 色达县| 上犹县| 杭锦旗| 罗平县| 敦化市| 沙洋县| 台中县| 天台县| 湘潭县| 永城市| 罗江县| 青铜峡市| 黎川县| 黄梅县| 南康市| 巴彦县| 孝昌县| 成安县| 万安县| 阜南县| 襄垣县| 甘孜|