官术网_书友最值得收藏!

3 Material Inspection and Storage

3.1 General Requirements

3.1.1 The material shall be inspected when delivered to the construction site.The variety,specification,performance of materials shall meet the national product standards and design requirements.The quality of imported materials shall meet the design requirements and contract stipulations.

3.1.2 When there are low temperature impact toughness requirements for materials in the design document,the low temperature impact toughness value in the product's quality proof document shall meet the requirements of the design document.

3.1.3 The materials shall not be used if one of the following conditions exists:

1 The characteristic data of quality proof document disaccord with that of the product standard or technical conditions for procurement.

2 There is disagreement on the characteristic data of the quality proof document.

3 The material object mark does not conform with that in the quality proof document.

4 The materials with reinspection requirements undergo no reinspection or fail in the reinspection.

3.1.4 The place for storing materials shall be smooth without accumulated water and the road shall be unblocked.The mark of materials shall be clear and accurate and the underlying shall be reasonable.The parts packed in boxes and the standard fasteners used for connection should be stored indoors.

主站蜘蛛池模板: 灯塔市| 西乌珠穆沁旗| 铜鼓县| 荣成市| 建昌县| 宁武县| 盈江县| 湛江市| 哈尔滨市| 溆浦县| 宜川县| 栾城县| 花莲县| 兖州市| 库伦旗| 东兴市| 德令哈市| 阳新县| 南和县| 宁国市| 江孜县| 阿合奇县| 天等县| 灵丘县| 迁安市| 南部县| 夹江县| 尼勒克县| 鲁甸县| 红桥区| 当阳市| 郎溪县| 沈阳市| 长治县| 托里县| 石柱| 泸水县| 长乐市| 漳浦县| 仙游县| 昂仁县|