3.2 Material Mobilization
3.2.1 For material mobilization,the material plan shall be prepared in advance,and the material mobilization shall be organized according to the project scheduling.
3.2.2 The material shall be inspected and meet the following requirements prior to mobilization:
1 The ex-factory quality qualification documents of raw materials and standard elements shall be inspected,and their types,specifications and performance shall conform to the requirements of the design technical document or related current national product standards.
2 The quality of actual raw materials and standard elements shall be subject to random check of 1%of the materials(not less than 5 pieces)shall be checked per batch and type.In case re-inspection is specified in the design technical document or related current national standards,the re-inspection shall be performed as specified.
3 The unqualified raw materials and standard elements shall be timely removed from the site.
3.2.3 Upon mobilization,the raw materials and standard elements shall be free of defect,properly kept,and stored by category.
- GB 50227-2017 并聯(lián)電容器裝置設(shè)計規(guī)范
- 電站汽輪發(fā)電機組輔機換熱設(shè)備選型設(shè)計規(guī)程
- GB50432-2007煉焦工藝設(shè)計規(guī)范(英文版)
- GB50542-2009石油化工廠區(qū)管線綜合技術(shù)規(guī)范(英文版)
- 真空電子器件生產(chǎn)線設(shè)備安裝技術(shù)標(biāo)準(zhǔn)
- GB/T 51266-2017 機械工廠年時基數(shù)設(shè)計標(biāo)準(zhǔn)
- GB51105-2015擠壓鋼管工程設(shè)備安裝與驗收規(guī)范(英文版)
- 電子CAD技術(shù)項目化教程
- GB/T 51339-2018 非煤礦山采礦術(shù)語標(biāo)準(zhǔn)
- GB50402-2007燒結(jié)機械設(shè)備工程安裝驗收規(guī)范(英文版)
- GB/T 50436-2017 線材軋鋼工程設(shè)計標(biāo)準(zhǔn)
- 工業(yè)文化研究(第2輯):紀(jì)念改革開放四十年——中國工業(yè)的大轉(zhuǎn)型
- 電氣工程師手冊(第4版)
- DL/T5161.4-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第4部分:母線裝置施工質(zhì)量檢驗(英文版)
- GB/T 51223-2017 公共建筑標(biāo)識系統(tǒng)技術(shù)規(guī)范