3.2 Material Mobilization
3.2.1 For material mobilization,the material plan shall be prepared in advance,and the material mobilization shall be organized according to the project scheduling.
3.2.2 The material shall be inspected and meet the following requirements prior to mobilization:
1 The ex-factory quality qualification documents of raw materials and standard elements shall be inspected,and their types,specifications and performance shall conform to the requirements of the design technical document or related current national product standards.
2 The quality of actual raw materials and standard elements shall be subject to random check of 1%of the materials(not less than 5 pieces)shall be checked per batch and type.In case re-inspection is specified in the design technical document or related current national standards,the re-inspection shall be performed as specified.
3 The unqualified raw materials and standard elements shall be timely removed from the site.
3.2.3 Upon mobilization,the raw materials and standard elements shall be free of defect,properly kept,and stored by category.
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- GB50526-2010公共廣播系統工程技術規范(英文版)
- GB 51227-2017 立井鉆井法施工及驗收規范
- GB50172-2012電氣裝置安裝工程蓄電池施工及驗收規范(英文版)
- GB/T50663-2011核電廠工程水文技術規范(英文版)
- GB 51134-2015 煤礦瓦斯發電工程設計規范
- GB 51203-2016 高聳結構工程施工質量驗收規范
- GB 51184-2016 礦山提升井塔設計規范
- DL/T 5160-2015 電力工程巖土描述技術規程
- GB 50426-2016 印染工廠設計規范
- 冶金石灰焙燒工程設計標準
- DL/T 5516-2016 火力發電廠集中控制室及電子設備間布置設計規程
- NB/T 25046-2015 核電廠水工設計規范
- DL 5068-2014 發電廠化學設計規范
- 建設工程化學灌漿材料應用技術標準