官术网_书友最值得收藏!

4 Equipment Installation

4.1 General Requirements

4.1.1 The equipment completely assembled and adjusted in the factory should not be disassembled at site but installed as a whole.

4.1.2 As for the equipment which is supplied in the form of parts and elements,their cleaning and assembly at site shall comply with the requirements of the design technical document or the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).

4.1.3 The connection of equipment and pipes shall not be carried out by brute force.After completion of connection,it is required to recheck whether the installation accuracy of the equipment meets the requirement.

主站蜘蛛池模板: 安康市| 新兴县| 策勒县| 平凉市| 新丰县| 江华| 汕头市| 平定县| 金山区| 临澧县| 桃园县| 潍坊市| 静海县| 天柱县| 健康| 广元市| 延川县| 淳安县| 大余县| 惠州市| 略阳县| 天镇县| 如皋市| 宿松县| 博罗县| 石台县| 柘荣县| 余干县| 玉门市| 抚远县| 全南县| 兴隆县| 台南市| 临泽县| 烟台市| 德安县| 砚山县| 周口市| 阜阳市| 尼玛县| 北流市|