- GB50730-2011冶金機械液壓、潤滑和氣動設備工程施工規范(英文版)
- 中國冶金建設協會
- 3字
- 2020-09-25 15:30:06
4 Equipment Installation
4.1 General Requirements
4.1.1 The equipment completely assembled and adjusted in the factory should not be disassembled at site but installed as a whole.
4.1.2 As for the equipment which is supplied in the form of parts and elements,their cleaning and assembly at site shall comply with the requirements of the design technical document or the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
4.1.3 The connection of equipment and pipes shall not be carried out by brute force.After completion of connection,it is required to recheck whether the installation accuracy of the equipment meets the requirement.
推薦閱讀
- 架空輸電線路荷載規范
- 加油站在役油罐防滲漏改造工程技術標準
- GB/T 51216-2017 移動通信基站工程節能技術標準
- GB50432-2007煉焦工藝設計規范(英文版)
- GB/T 51132-2015 工業有色金屬管道工程施工及質量驗收規范
- GB 51136-2015 薄膜晶體管液晶顯示器工廠設計規范
- 換流站接地極設計文件內容深度規定
- GB/T 51250-2017 微電網接入配電網系統調試與驗收規范
- GB/T 51200-2016 高壓直流換流站設計規范
- DL/T5210.4-2009電力建設施工質量驗收及評價規程第4部分:熱工儀表及控制裝置(英文版)
- GB 51181-2016 煤炭洗選工程節能設計規范
- 工程師形成的質量規制研究
- 石油化工大型設備吊裝現場地基處理技術標準
- GB50967-2014焦化機械設備安裝規范(英文版)
- 林產加工工業職業安全衛生設計標準