4 Equipment Installation
4.1 General Requirements
4.1.1 The equipment completely assembled and adjusted in the factory should not be disassembled at site but installed as a whole.
4.1.2 As for the equipment which is supplied in the form of parts and elements,their cleaning and assembly at site shall comply with the requirements of the design technical document or the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
4.1.3 The connection of equipment and pipes shall not be carried out by brute force.After completion of connection,it is required to recheck whether the installation accuracy of the equipment meets the requirement.
推薦閱讀
- GB50170-2006電氣裝置安裝工程旋轉(zhuǎn)電機施工及驗收規(guī)范(英文版)
- GB50542-2009石油化工廠區(qū)管線綜合技術(shù)規(guī)范(英文版)
- GB/T 51257-2017 液化天然氣低溫管道設(shè)計規(guī)范
- GB 51134-2015 煤礦瓦斯發(fā)電工程設(shè)計規(guī)范
- GB 51184-2016 礦山提升井塔設(shè)計規(guī)范
- DL/T 5505-2015 電力應(yīng)急通信設(shè)計技術(shù)規(guī)程
- DL/T 5516-2016 火力發(fā)電廠集中控制室及電子設(shè)備間布置設(shè)計規(guī)程
- DL 5068-2014 發(fā)電廠化學(xué)設(shè)計規(guī)范
- 電力系統(tǒng)無功補償及調(diào)壓設(shè)計技術(shù)導(dǎo)則
- GB/T 51280-2018 工程泥沙設(shè)計標準
- GB 50372-2006 煉鐵機械設(shè)備工程安裝驗收規(guī)范 (英文版)
- GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范
- GB 50295-2016 水泥工廠設(shè)計規(guī)范
- GB/T 50451-2017 煤礦井下排水泵站及排水管路設(shè)計規(guī)范
- YS/T 5425-2014 有色金屬加工設(shè)備安裝工程質(zhì)量檢驗評定標準