- YD/T 5131-2005 移動通信工程鋼塔桅結(jié)構(gòu)設(shè)計規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 191字
- 2021-04-20 11:26:55
4 Structure Calculation
4.1 General Requirements
4.1.1 The structure for mobile communication engineering steel tower and mast includes free-standing steel tower,steel pole,guyed steel mast and other types.
4.1.2 The service requirement,surrounding environment,landscape,bearing capacity of buildings,project cost and other factors shall be taken into account for the selection of structure for mobile communication engineering steel tower and mast.
4.1.3 The ultimate limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The wind load and ice load may be calculated as the first variable load in order.When necessary,the seismic checking calculation is required.
4.1.4 The serviceability limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The corresponding variation provisions shall be met.
4.1.5 The corresponding calculation diagram shall be selected based on platform structure type to calculate the internal force and displacement of structure platform for mobile communication engineering steel tower and mast.The tower body may be deemed as the base of platform structure.
- GB/T 50537-2017 油氣田工程測量標準
- 健康座椅
- 配用電通信技術(shù)及產(chǎn)業(yè)發(fā)展報告
- GB 51227-2017 立井鉆井法施工及驗收規(guī)范
- GB/T 50943-2015 海岸軟土地基堤壩工程技術(shù)規(guī)范
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規(guī)范(英文版)
- GB/T 51266-2017 機械工廠年時基數(shù)設(shè)計標準
- 汽車故障診斷技巧與禁忌速查手冊
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術(shù)規(guī)范
- 平板玻璃工廠節(jié)能設(shè)計標準
- 配電網(wǎng)規(guī)劃研究報告內(nèi)容深度規(guī)定
- GB50071-2014小型水力發(fā)電站設(shè)計規(guī)范(英文版)
- 工控技術(shù)應(yīng)用數(shù)學(修訂版)
- GB50679-2011煉鐵機械設(shè)備安裝規(guī)范(英文版)
- 陽極焙燒爐用多功能機組安裝技術(shù)規(guī)程