官术网_书友最值得收藏!

4 Structure Calculation

4.1 General Requirements

4.1.1 The structure for mobile communication engineering steel tower and mast includes free-standing steel tower,steel pole,guyed steel mast and other types.

4.1.2 The service requirement,surrounding environment,landscape,bearing capacity of buildings,project cost and other factors shall be taken into account for the selection of structure for mobile communication engineering steel tower and mast.

4.1.3 The ultimate limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The wind load and ice load may be calculated as the first variable load in order.When necessary,the seismic checking calculation is required.

4.1.4 The serviceability limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The corresponding variation provisions shall be met.

4.1.5 The corresponding calculation diagram shall be selected based on platform structure type to calculate the internal force and displacement of structure platform for mobile communication engineering steel tower and mast.The tower body may be deemed as the base of platform structure.

主站蜘蛛池模板: 景谷| 凉山| 武宣县| 肇东市| 瑞昌市| 安福县| 龙山县| 郸城县| 南漳县| 新沂市| 盈江县| 吉首市| 民和| 彰化县| 绥化市| 县级市| 平舆县| 盐池县| 原阳县| 额敏县| 临泽县| 牙克石市| 化州市| 库尔勒市| 井冈山市| 麻栗坡县| 隆尧县| 建德市| 延吉市| 定结县| 上虞市| 达孜县| 合水县| 江陵县| 和田县| 资兴市| 略阳县| 龙口市| 乐安县| 巢湖市| 平凉市|