官术网_书友最值得收藏!

4 Structure Calculation

4.1 General Requirements

4.1.1 The structure for mobile communication engineering steel tower and mast includes free-standing steel tower,steel pole,guyed steel mast and other types.

4.1.2 The service requirement,surrounding environment,landscape,bearing capacity of buildings,project cost and other factors shall be taken into account for the selection of structure for mobile communication engineering steel tower and mast.

4.1.3 The ultimate limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The wind load and ice load may be calculated as the first variable load in order.When necessary,the seismic checking calculation is required.

4.1.4 The serviceability limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The corresponding variation provisions shall be met.

4.1.5 The corresponding calculation diagram shall be selected based on platform structure type to calculate the internal force and displacement of structure platform for mobile communication engineering steel tower and mast.The tower body may be deemed as the base of platform structure.

主站蜘蛛池模板: 灵宝市| 会理县| 信丰县| 兰溪市| 阳泉市| 保康县| 天长市| 石嘴山市| 蒙城县| 汉源县| 高尔夫| 凤阳县| 惠州市| 泸定县| 乌恰县| 北宁市| 舒兰市| 方正县| 蕲春县| 思南县| 汝阳县| 泾川县| 五河县| 万盛区| 定西市| 和静县| 崇文区| 绥德县| 彩票| 罗城| 金秀| 曲水县| 云南省| 富源县| 普安县| 工布江达县| 安徽省| 太仆寺旗| 通辽市| 毕节市| 友谊县|