4 Structure Calculation
4.1 General Requirements
4.1.1 The structure for mobile communication engineering steel tower and mast includes free-standing steel tower,steel pole,guyed steel mast and other types.
4.1.2 The service requirement,surrounding environment,landscape,bearing capacity of buildings,project cost and other factors shall be taken into account for the selection of structure for mobile communication engineering steel tower and mast.
4.1.3 The ultimate limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The wind load and ice load may be calculated as the first variable load in order.When necessary,the seismic checking calculation is required.
4.1.4 The serviceability limit state of structure for mobile communication engineering steel tower and mast shall be calculated based on the provisions set out in Section 3.1.The corresponding variation provisions shall be met.
4.1.5 The corresponding calculation diagram shall be selected based on platform structure type to calculate the internal force and displacement of structure platform for mobile communication engineering steel tower and mast.The tower body may be deemed as the base of platform structure.
- GB/T51075-2015選礦機(jī)械設(shè)備工程安裝規(guī)范(英文版)
- 微波集成組件生產(chǎn)工廠工藝設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 51183-2016 農(nóng)業(yè)溫室結(jié)構(gòu)荷載規(guī)范
- GB 51221-2017 城鎮(zhèn)污水處理廠工程施工規(guī)范
- GB/T51154-2015海底光纜工程設(shè)計(jì)規(guī)范(英文版)
- GB50764-2012電廠動(dòng)力管道設(shè)計(jì)規(guī)范(英文版)
- 機(jī)械基礎(chǔ)地基動(dòng)力特性測(cè)試規(guī)程
- 海上架空輸電線路設(shè)計(jì)技術(shù)規(guī)程
- 工控技術(shù)應(yīng)用數(shù)學(xué)(修訂版)
- GB/T 50398-2018 無(wú)縫鋼管工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 50312-2016 綜合布線系統(tǒng)工程驗(yàn)收規(guī)范
- GB/T 51293-2018 城市軌道交通給水排水系統(tǒng)技術(shù)標(biāo)準(zhǔn)
- DL/T 5501-2015 凍土地區(qū)架空輸電線路基礎(chǔ)設(shè)計(jì)技術(shù)規(guī)程
- GB 50403-2017 煉鋼機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范
- 計(jì)算機(jī)自適應(yīng)語(yǔ)言測(cè)試模型設(shè)計(jì)與效度驗(yàn)證