官术网_书友最值得收藏!

3.3 Materials Inspection

3.3.1 The specifications,types and quantity of materials shall meet the requirements of the procurement contract and design document.

3.3.2 Land cables,ODF and land cable joints shall be inspected in accordance with the current professional standard of Code for the Acceptance of Communications Line Engineering YD 5121.

3.3.3 Cable terminating boxes,land cable joints and beach joints shall be in accordance with the following requirements:

1 All functional modules should be complete and the cabinets shall be intact;

2 Plastic parts shall be free of glitches,air bubbles,cracks,voids,warping,impurities or other defects;

3 Metal structural members shall be smooth in surface and uniform in color;

4 Coating adhesion shall be firm,without peeling,paint chips or other defects;

5 All fasteners shall be in solid and reliable connection,cabinet sealing strips shall be smoothly and firmly stuck to the cabinet,and accessories shall be complete;

6 Doors of cable terminating boxes shall be able to open and close freely and reliably,and have high-voltage warning signs.

3.3.4 Before loading,submarine cables shall be visually inspected;their optical and electrical parameters shall be tested and meet the requirements of the procurement contract and design document.

主站蜘蛛池模板: 木里| 隆昌县| 南城县| 沾益县| 宾川县| 策勒县| 彩票| 新宾| 萨迦县| 奉新县| 丁青县| 永靖县| 汉寿县| 岳西县| 鸡西市| 临泉县| 余江县| 贺兰县| 商丘市| 乐都县| 巢湖市| 金堂县| 额敏县| 唐海县| 农安县| 温州市| 张家港市| 郎溪县| 梧州市| 渭南市| 德保县| 万州区| 息烽县| 思茅市| 公安县| 凤城市| 阳原县| 建平县| 读书| 巴塘县| 大悟县|