官术网_书友最值得收藏!

3.3 Materials Inspection

3.3.1 The specifications,types and quantity of materials shall meet the requirements of the procurement contract and design document.

3.3.2 Land cables,ODF and land cable joints shall be inspected in accordance with the current professional standard of Code for the Acceptance of Communications Line Engineering YD 5121.

3.3.3 Cable terminating boxes,land cable joints and beach joints shall be in accordance with the following requirements:

1 All functional modules should be complete and the cabinets shall be intact;

2 Plastic parts shall be free of glitches,air bubbles,cracks,voids,warping,impurities or other defects;

3 Metal structural members shall be smooth in surface and uniform in color;

4 Coating adhesion shall be firm,without peeling,paint chips or other defects;

5 All fasteners shall be in solid and reliable connection,cabinet sealing strips shall be smoothly and firmly stuck to the cabinet,and accessories shall be complete;

6 Doors of cable terminating boxes shall be able to open and close freely and reliably,and have high-voltage warning signs.

3.3.4 Before loading,submarine cables shall be visually inspected;their optical and electrical parameters shall be tested and meet the requirements of the procurement contract and design document.

主站蜘蛛池模板: 涟源市| 鄂州市| 伊川县| 阿荣旗| 和硕县| 文山县| 康定县| 临朐县| 天祝| 江津市| 明溪县| 迭部县| 云霄县| 南郑县| 宁陕县| 安达市| 密云县| 安远县| 临高县| 乌兰浩特市| 兰溪市| 巧家县| 鄄城县| 阜康市| 盘山县| 军事| 临安市| 嘉鱼县| 涪陵区| 华坪县| 仁怀市| 富源县| 施甸县| 民县| 五华县| 保康县| 伊金霍洛旗| 晋中市| 昌江| 类乌齐县| 嘉鱼县|