舉報

會員
GB/T51167-2016海底光纜工程驗收規(guī)范(英文版)
最新章節(jié):
11.3 Trial Operation
本規(guī)范共分11章,主要技術(shù)內(nèi)容包括:總則,術(shù)語和符號,主要設備和器材的檢驗,海底光纜線路鋪設前期準備,陸地光電纜敷設和接地裝置安裝及測試,海底光纜鋪設和測試,登陸站設備安裝,登陸站內(nèi)設備功能檢查及本機測試,海底光纜系統(tǒng)功能檢查及性能測試,竣工文件,工程驗收。本規(guī)范適用于我國海域內(nèi)建設的海底光纜線路和海底光纜數(shù)字信號傳輸系統(tǒng)以及相關(guān)輔助系統(tǒng)工程驗收。
目錄(51章)
倒序
- 封面
- 版權(quán)信息
- Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Inspection of Equipment and Materials
- 3.1 Generic Requirements
- 3.2 Equipment Inspection
- 3.3 Materials Inspection
- 4 Preparation for Submarine Cable Installation
- 5 Installation and Testing of Land Cable and Sea Earth System
- 6 Installation and Testing of Submerged Plant
- 7 Installation of Landing Station Equipment
- 8 Testing of Terminal Station Equipment Functions and Performance
- 8.1 Testing of Submarine Line Terminal Equipment
- 8.2 Testing of Power Feeding Equipment
- 9 Testing of Function and Performance of Submarine Optical Cable System
- 9.1 Testing of Cable Line
- 9.2 Testing of Function and Performance of Digital Transmission System
- 9.3 Testing of Function and Performance of Power Feeding System
- 9.4 Testing of Function and Performance of Auxiliary System
- 10 Project Documentation
- 11 Project Acceptance
- 11.1 On-site Acceptance
- 11.2 Provisional Acceptance
- 11.3 Trial Operation
- 11.4 Final Acceptance
- Explanation of Wording in This Code
- List of Quoted Standards
- Explanation of Provisions
- Purpose of this Explanation
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 5 Installation and Testing of Land Cable and Sea Earth System
- 6 Installation and Testing of Submerged Plant
- 8 Testing of Terminal Station Equipment Functions and Performance
- 8.1 Testing of Submarine Line Terminal Equipment
- 8.2 Testing of Power Feeding Equipment
- 9 Testing of Function and Performance of Submarine Optical Cable System
- 9.1 Testing of Cable Line
- 9.2 Testing of Function and Performance of Digital Transmission System
- 9.3 Testing of Function and Performance of Power Feeding System
- 10 Project Documentation
- 11 Project Acceptance
- 11.1 On-site Acceptance
- 11.2 Provisional Acceptance
- 11.3 Trial Operation 更新時間:2020-09-25 15:32:21
推薦閱讀
- GB/T 51146-2015 硝化甘油生產(chǎn)廢水處理設施技術(shù)規(guī)范
- 健康座椅
- GB 51145-2015 煤礦電氣設備安裝工程施工與驗收規(guī)范
- 加油站在役油罐防滲漏改造工程技術(shù)標準
- DL/T 5546-2018 自然通風冷卻塔防腐設計導則
- 光伏支架結(jié)構(gòu)設計規(guī)程
- GB/T 50491-2018 鐵礦球團工程設計標準
- GB 50084-2017 自動噴水滅火系統(tǒng)設計規(guī)范
- GB50217-2007電力工程電纜設計規(guī)范(英文版)
- 平板玻璃工廠節(jié)能設計標準
- DL/T 5516-2016 火力發(fā)電廠集中控制室及電子設備間布置設計規(guī)程
- 智能家電軟件功能安全標準解析與實踐
- GB 50588-2017 水泥工廠余熱發(fā)電設計標準
- DL/T 5097-2014 火力發(fā)電廠貯灰場巖土工程勘測技術(shù)規(guī)程
- 核電廠混凝土結(jié)構(gòu)技術(shù)標準
- GB/T 51280-2018 工程泥沙設計標準
- 沖壓加工技能培訓與操作實踐
- GB 51199-2016 通信電源設備安裝工程驗收規(guī)范(英文版)
- GB/T 51242-2017 同步數(shù)字體系(SDH)光纖傳輸系統(tǒng)工程設計規(guī)范
- GB 50421-2018 有色金屬礦山排土場設計標準
- GB50930-2013冷軋帶鋼工廠設計規(guī)范(英文版)
- GB 50849-2014 傳染病醫(yī)院建筑設計規(guī)范
- GB 50406-2017 鋼鐵工業(yè)環(huán)境保護設計規(guī)范
- GB/T 51277-2018 礦山立井凍結(jié)法施工及質(zhì)量驗收標準
- DL/T 5217-2013 220KV-500KV緊湊型架空輸電線路設計技術(shù)規(guī)程
- GB 50689-2011通信局(站)防雷與接地工程設計規(guī)范(英文版)
- GB/T 51178-2016 建材礦山工程測量技術(shù)規(guī)范
- GB/T 51319-2018 醫(yī)藥工藝用氣系統(tǒng)工程設計標準
- 油氣田及管道巖土工程勘察標準
- YD 5173-2015 數(shù)字蜂窩移動通信網(wǎng)WCDMA工程驗收規(guī)范(英文版)