4 Surveying and ROW Clearance
4.1 General Provision
4.1.1 Prior to construction,stake handover work shall be conducted.The contents of stake handover work shall include line control stake,temporary and permanent bench mark provided along the line.Stake handover record shall be signed for approval by representative of each party.
4.1.2 Obstructions shall be located accurately before surveying.Corresponding measures shall be taken to avoid obstructions during construction.
4.1.3 Survey personnel shall position the pipeline centerline and right-of-way limits.Each coordinate of pile shall be rechecked.
4.1.4 Construction contractor check and supervision unit repetition survey method shall be used for construction survey.
4.1.5 The allowable deviation of construction survey shall be compliance with Current national standard requirements of-“Code for Engineering Surveying”GB 50026.
4.1.6 After completion of pipeline erection,as-built survey shall be conducted.The actual survey value shall be indicated on original design drawings.The pipeline as-built drawing and single line diagram shall be drawn up.
4.1.7 After backfilling of pipe trench,the coordination controlling pile,and turning pile shall be recovered to original position.
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- GB50170-2006電氣裝置安裝工程旋轉電機施工及驗收規范(英文版)
- GB 51287-2018 煤炭工業露天礦土地復墾工程設計標準
- GB 51209-2016 發光二極管工廠設計規范
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB50629-2010板帶軋鋼工藝設計規范(英文版)
- DL/T5231-2010±800kV及以下直流輸電接地極施工及驗收規程(英文版)
- GB 51284-2018 煙氣脫硫工藝設計規范
- GB/T 51200-2016 高壓直流換流站設計規范
- DL/T 5334-2016 電力工程勘測安全規程
- 《電氣裝置安裝工程 低壓電器施工及驗收規范》實施指南
- DL/T 866-2015 電流互感器和電壓互感器選擇及計算規程
- GB50473-2008鋼制儲罐地基基礎設計規范(英文版)
- GB/T 51223-2017 公共建筑標識系統技術規范
- DL/T5161.11-2002電氣裝置安裝工程質量檢驗及評定規程第11部分:電梯電氣裝置施工質量檢驗(英文版)