4.2 Surveying
4.2.1 Prior to survey,following stake handover and shift work shall be properly conducted:
1 Construction contractor shall protect the coordination controlling piles and turning point stakes with necessary measures after handover by design contractor.
2 Detailed review and on site verification shall be conducted for route survey data,route layout and profile.
3 Proper identification shall be marked on fixed reference object.Pile number shall be indicated and the direction shall be pointed out.
4 The equidistance method of moving stakes along paralleling pipeline centerline may be used for plain areas and the traverse method of positioning pipeline may be used for mountain areas with difficulties to move stakes.
4.2.2 Pile coordinate data shall be reviewed based on permanent benchmarks and pipeline centerline shall be surveyed.The stakes of one-hundred-meter spacing pile,longitudinal slope change pile,wall thickness change pile,crossings makers pile,and curve additional pile between turning point piles shall be set up and identified information such as the pile type,number,milestone etc..
4.2.3 Survey of pipeline centerline shall include handover point survey,deflection angle survey,centerline milestone pile survey and round curve survey.
4.2.4 The curve additional piles shall be set up for larger pipeline horizontal defection angle and spacing between curve additional piles shall be not more than 10 meters.
4.2.5 Survey personnel shall check the quantity and angle of flexible laying pipe section,cold bending section and hot bending section in design drawings.
4.2.6 For flexible laying section or cold bending section,their horizontal turning point shall be set out with a curve on ground according to the parameters such as length of tangent line,and external vector moment.For the pipe section adopted with prefabricated bend pipe,the curve shall be laid out according to curvature radius and angle.
4.2.7 For the pipeline located in mountainous area and the pipeline with comparatively large topographic areas,the slope change point location,angle and curvature radius of longitudinal deflection angle change point shall be defined on the basis of construction drawings and or measurement data.
4.2.8 Radius for curvature with horizontal flexible laying shall not be less than 1000 times steel pipe diameter.Radius for curvature of elastic laying pipeline on vertical surface shall be more than curvature radius of deflection curve generated for pipe under self-gravity effect.Radius for pipeline elastic bending curvature shall be calculated as below:

Where R——pipe elastic curvature radius(m)
D——steel pipe OD(m)
α——pipe deflection angle(°)
4.2.9 Pipeline horizontal angle and longitudinal angle should be adopted with round curve with the same curvature radius for control.
4.2.10 In order to ensure that pipeline flexible laying is attached to trench bottom,surveying shall be conducted as required by design and pipeline trench depth shall be in compliance with design requirements.
- 架空輸電線路荷載規(guī)范
- GB 51276-2018 煤炭企業(yè)總圖運輸設(shè)計標(biāo)準(zhǔn)
- DL/T 5390-2014 發(fā)電廠和變電站照明設(shè)計技術(shù)規(guī)定
- GB50588-2017水泥工廠余熱發(fā)電設(shè)計標(biāo)準(zhǔn)(英文版)
- GB/T 50943-2015 海岸軟土地基堤壩工程技術(shù)規(guī)范
- GB 50309-2017 工業(yè)爐砌筑工程質(zhì)量驗收標(biāo)準(zhǔn)
- GB 51179-2016 煤礦井下煤炭運輸設(shè)計規(guī)范
- GB/T 50770-2013 石油化工安全儀表系統(tǒng)設(shè)計規(guī)范(英文版)
- DL/T5161.5-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第5部分:電纜線路施工質(zhì)量檢驗(英文版)
- GB 51258-2017 玻璃纖維工廠設(shè)計標(biāo)準(zhǔn)
- GB 50603-2010 鋼鐵企業(yè)總圖運輸設(shè)計規(guī)范(英文版)
- GB50468-2008焊管工藝設(shè)計規(guī)范(英文版)
- 電力數(shù)據(jù)通信網(wǎng)絡(luò)工程初步設(shè)計文件內(nèi)容深度規(guī)定
- 建筑廢棄物再生工廠設(shè)計標(biāo)準(zhǔn)
- 建筑施工技術(shù)(中職)