6 Stringing
6.0.1 Prior to stringing,grading for out-of-roundness of pipe ends and wall thickness shall be conducted and stringing works shall be compliance with design requirements.
6.0.2 The landform and geological conditions of right-of-way of pipes intended shall be familiarized and pipes shall be strung on the wider sides when surrounding area is gully,road and bank,etc.Pipes shall not be laid on the structures.
6.0.3 The end-to-tail connection of pipeline is required and neighboring pipe ending turns up to be zigzag shaped and separated.Sand bag or other flexible material should be used for pipe supports.
6.0.4 During stringing,steel pipe shall be stably placed.
6.0.5 For stringing in trench,the safety distance from edge of pipeline to edge of pipe trench shall be in compliance with the provisions of table 6.0.5.
Table 6.0.5 Safety Distance from Edge of Pipeline to Edge of Pipe Trenchy(m)

- GB 51180-2016 煤礦采空區(qū)建(構(gòu))筑物地基處理技術(shù)規(guī)范
- GB 51145-2015 煤礦電氣設(shè)備安裝工程施工與驗(yàn)收規(guī)范
- GB 51289-2018 煤炭工業(yè)露天礦邊坡工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T51075-2015選礦機(jī)械設(shè)備工程安裝規(guī)范(英文版)
- 電動(dòng)汽車工程手冊(cè)(第六卷):智能網(wǎng)聯(lián)
- DL/T 5503-2015 直流換流站施工圖設(shè)計(jì)內(nèi)容深度規(guī)定
- 微波集成組件生產(chǎn)工廠工藝設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 50643-2018 橡膠工廠職業(yè)安全衛(wèi)生設(shè)計(jì)標(biāo)準(zhǔn)
- GB50580-2010連鑄工程設(shè)計(jì)規(guī)范(英文版)
- 錦綸工廠設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 51238-2018 巖溶地區(qū)建筑地基基礎(chǔ)技術(shù)標(biāo)準(zhǔn)
- SH/T3143-2012石油化工往復(fù)壓縮機(jī)工程技術(shù)規(guī)范(英文版)
- 配電網(wǎng)規(guī)劃研究報(bào)告內(nèi)容深度規(guī)定
- 鐵路罐車清洗設(shè)施設(shè)計(jì)標(biāo)準(zhǔn)
- DL/T5161.4-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第4部分:母線裝置施工質(zhì)量檢驗(yàn)(英文版)