- GB50730-2011冶金機械液壓、潤滑和氣動設備工程施工規范(英文版)
- 中國冶金建設協會
- 382字
- 2020-09-25 15:30:04
Foreword
According to the requirements of JBH[2006]No.136 issued by former Ministry of Construction"Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2006(second batch)",this Code is hereby established by China First Metallurgical Group Co.,Ltd.jointly with related companies.
During establishment of the Code,the preparation group has studied related current national laws,regulations and standards;made extensive and in-depth investigation;concluded many years'experience in the installation of hydraulic,lubrication and pneumatic system with regards to metallurgical mechanical equipment;widely sought the advice from related companies and experts;repeatedly discussed,revised and enhanced the provisions of the Code;and finalized this text upon review.
The Code consists of nine chapters with the main contents as follows:general provisions;basic requirements;equipment and material mobilization;equipment installation;pipe fabrication and installation;pipe flushing,purging and pressure test;commissioning and test run;pipe painting,and safety and environmental protection.
The provision(s)printed in bold type in this Code is(are)mandatory,and shall be enforced strictly.Ministry of Housing and Urban-Rural Development is responsible for Code management and explanation of the mandatory provisions,while China Metallurgical Construction Association is in charge of daily management,and China First Metallurgical Group Co.,Ltd.is responsible for explanation of the specific technical contents.All relevant organizations are kindly requested to sum up and accumulate experiences in actual practices during the process of implementing this code.The relevant opinions and advice,whenever necessary,can be posted or passed on to China First Metallurgical Group Co.,Ltd.(address:No.3 Gongye Avenue,Qingshan District,Wuhan,Hubei province;Zip code:430081;E-mail:jisc@cfmcc.com or xiaolw@cfmcc.com;Fax:027-86308221)for reference in case of future revision.
Chief Development Organization:
China First Metallurgical Group Co.,Ltd.
Participating Development Organization:
Shanghai Baoye Group Co.,Ltd.
Chief Drafting Staff:
Zou Yichang Xiao Liwen Zhang Li Wu Gangping Song Zhanjiang
Liu Shiyin Lao Xiaoyun Luo Jin Kong Daping Li Mingzhu
Yu Huachun Guo Qijiao Zhang Yongxin Li Xi Yan Yu
Zheng Yongheng Wu Mingfu Li Changliang Lu Fuli Zhao Cong
Sun Qing
- 鋼鐵企業原料場工程設計標準
- GB 51177-2016 升船機設計規范
- GB50432-2007煉焦工藝設計規范(英文版)
- GB/T 51257-2017 液化天然氣低溫管道設計規范
- 巖土靜力載荷試驗規程
- 濕陷性土起始壓力測試規程
- DL/T 5156.1-2015 電力工程勘測制圖標準 第1部分:測量
- 標準貫入試驗規程
- DL/T5161.8-2002電氣裝置安裝工程質量檢驗及評定規程第8部分:盤、柜及二次回路接線施工質量檢驗(英文版)
- 海上架空輸電線路設計技術規程
- GB/T 51293-2018 城市軌道交通給水排水系統技術標準
- 巖土工程勘察報告編制規程
- GB50967-2014焦化機械設備安裝規范(英文版)
- GB 51247-2018 水工建筑物抗震設計標準
- GB/T 50451-2017 煤礦井下排水泵站及排水管路設計規范