4.10 Pump and Pump Set
4.10.1 The installation of pumps and pump sets shall comply with the following requirements:
1 The longitudinal and horizontal center lines shall be adjusted,and the measurement by plumb wire should be carried out,with the allowable deviation of 10.0mm.
2 The elevation shall be adjusted,and the measurement by optical instrument or ruler should be carried out,with the allowable deviation of±10.0mm.
3 The axial levelness shall be adjusted,and the measurement by leveler should be carried out,with the allowable deviation of 0.1/1000 for centrifugal pump and 0.5/1000 for positive displacement pump.
4 The horizontal levelness shall be adjusted,and the measurement by leveler should be carried out,with the allowable deviation of 0.2/1000 for centrifugal pump and 0.5/1000 for positive displacement pump.
4.10.2 The assembly of couplings shall conform to related requirements of the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
- DL/T 5044-2014 電力工程直流電源系統設計技術規程
- 架空輸電線路荷載規范
- DL/T 5528-2017 輸變電工程結算審核報告編制導則
- 健康座椅
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- 巖土靜力載荷試驗規程
- GB 50469-2016 橡膠工廠環境保護設計規范
- GB 51203-2016 高聳結構工程施工質量驗收規范
- DL/T5161.5-2002電氣裝置安裝工程質量檢驗及評定規程第5部分:電纜線路施工質量檢驗(英文版)
- GB 51284-2018 煙氣脫硫工藝設計規范
- 鄭州軌道交通安裝工藝運營需求標準
- 冶金石灰焙燒工程設計標準
- GB50468-2008焊管工藝設計規范(英文版)
- DL 5068-2014 發電廠化學設計規范
- GB50830-2013冶金礦山采礦設計規范(英文版)