3.3 Land Flood Survey
3.3.1 In land flood survey,the following information shall be collected:the hydrographic map of drainage areas,topographic map of drainage areas and river reaches to be surveyed;physical geography conditions of drainage areas,locations and hydrological characteristics of water bodies in the area,characteristics,causes and historical records of rainstorms and floods,flood survey reports and data from hydrological stations;current status and planning of drainage areas and watercourses;survey and engineering data,construction quality and safety and operation data of water-related projects;ice-formation period,ice float period,way of ice break-up,distribution scope and duration of ice dams and ice jams.
3.3.2 The flood survey shall be conducted upstream and downstream the site.This survey should include main and branch waterway and even larger area if necessary.
3.3.3 The river reach to be surveyed shall be with straight watercourse,stable riverbed and under good control,without major tributary,backwater,distributary or banked-up water and with similar composition of riverbed material and bank vegetation.
3.3.4 For survey of floods,the focus shall be laid on the occurrence time of each extraordinary flood and the corresponding recurrence interval,flood marks,flood courses,changes in scour and silting,and riverbed roughness.The information on rainfall,water and disaster when the flood occurs shall be investigated.The source,cause,main flow direction and driftage of the floods shall be identified,and the existence of overland flow,distributary,crevasse,stagnant water as well as significant changes in the natural environment of drainage areas and watercourses shall be determined.The runoff floods shall be distinguished from dam-break floods caused by other causes.
3.3.5 The flood survey should be conducted in old residential areas and river reaches with more flood marks.At least three reliable or relatively reliable and representative flood marks shall be identified along one river bank for one flood survey,and the accuracy of the flood marks shall be validated.In desolate areas,flood marks may be identified by river deposits,flood scour marks,and flood biochemical marks on both banks.
3.3.6 The flood survey in plain areas shall focus on river network characteristics,historical water logging disasters,and current status and planning of local flood and water logging control works.
- GB50713-2011板帶精整工藝設計規范(英文版)
- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規范(英文版)
- DL/T5161.6-2002電氣裝置安裝工程質量檢驗及評定規程第6部分:接地裝置施工質量檢驗(英文版)
- GB 51006-2014 石油化工建(構)筑物結構荷載規范(英文版)
- 水泥工廠環境保護設施設計標準
- GB 51133-2015 醫藥工業環境保護設計規范
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規范
- GB/T 51278-2018 數字蜂窩移動通信網LTE工程技術標準
- GB/T 50459-2017 油氣輸送管道跨越工程設計標準
- GB/T50063-2008電力裝置的電測量儀表裝置設計規范(英文版)
- DL/T 5543-2018 特高壓輸變電工程環境影響評價內容深度規定
- DL/T 5516-2016 火力發電廠集中控制室及電子設備間布置設計規程
- GB 51208-2016 人工制氣廠站設計規范
- 電力系統無功補償及調壓設計技術導則
- 建筑廢棄物再生工廠設計標準