3.4 Low-water Survey
3.4.1 Before site survey,the hydrographic map of drainage areas,the topographic map of drainage areas and river reaches to be surveyed,data from hydrological stations,the characteristics of drought occurring in the drainage areas and the water recharge sources,relevant historical documents,relics and low-water survey reports,current status and planning of industrial,agricultural(animal husbandry),urban and ecoenvironmental water,and current status and planning and operation scheduling scheme of hydraulic projects shall be collected.
3.4.2 For the historical low-water survey,the following information shall be collected:the occurrence time,causes,durations and recurrence intervals of severe droughts;low-water level marks and water depth,drought area,water recharge sources,drought and water condition when the drought occurs,drought process and continuous drought;influences of human activities;the composition of riverbed material and the condition of river sections;main river channel change,and scouring and silting of river bed and river banks.
3.4.3 The historical low-water survey should be conducted in dry seasons,and the survey results obtained in other periods shall be reviewed in dry seasons.The return amount of surface water such as irrigation water shall be particularly surveyed,and whether there is dry-up shall be determined.
3.4.4 The upstream and downstream extent of historical low-water survey shall be determined according to the requirements for ascertaining low-water information and estimating low water flow.If necessary,severe droughts of adjacent rivers shall be surveyed for comparative analysis.
3.4.5 The low-water survey shall be conducted in well controlled river reaches with low-water marks that can be surveyed easily,with straight watercourse,stable flow,slight scouring and silting,and less effect of human activities.
3.4.6 The historical low-water marks can be surveyed based on permanent buildings or facilities of water resource,harbor and transportation authorities,river banks where residents collect water,and fishery condition.The occurrence time and duration of low water shall be analyzed and determined according to important historical events and those impressive to local residents in conjunction with collected historical records.
3.4.7 For historical low water level survey,more than three low-water marks shall be surveyed for one dry season.The low-water marks are classified into three types based on their reliability:reliable,relatively reliable,and informative.The classification criteria include whether the occurrence of low water is witnessed,whether the description is exact,whether the supporting evidences are sufficient and sound,and whether the low-water marks are fixed.
3.4.8 For low-water survey in karst areas,the water recharge sources and the distribution and water quantity of riverbed seepage shall be identified and shall be observed if necessary.
- GB 51139-2015 纖維素纖維用漿粕工廠設計規(guī)范
- 產(chǎn)品首版制作
- GB50551-2010球團機械設備安裝工程質(zhì)量驗收規(guī)范(英文版)
- 配用電通信技術及產(chǎn)業(yè)發(fā)展報告
- GB 51138-2015 尿素造粒塔工程施工及質(zhì)量驗收規(guī)范
- GB50542-2009石油化工廠區(qū)管線綜合技術規(guī)范(英文版)
- GB/T 50441-2016 石油化工設計能耗計算標準
- GB/T 50770-2013 石油化工安全儀表系統(tǒng)設計規(guī)范(英文版)
- GB/T50663-2011核電廠工程水文技術規(guī)范(英文版)
- GB/T 51332-2018 含硝基苯類化合物廢水處理設施工程技術標準
- GB50580-2010連鑄工程設計規(guī)范(英文版)
- GB 51237-2017 火工品試驗室工程技術規(guī)范
- 配電網(wǎng)規(guī)劃研究報告內(nèi)容深度規(guī)定
- GB 50603-2010 鋼鐵企業(yè)總圖運輸設計規(guī)范(英文版)
- 鐵路罐車清洗設施設計標準