- GB 50633-2010(英文版)核電廠工程測量技術(shù)規(guī)范
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 4字
- 2020-09-24 18:19:40
3 Horizontal Control Survey
3.1 General Provisions
3.1.1 The horizontal control network may be established using methods including satellite positioning survey,traverse survey and triangulation survey.
3.1.2 Horizontal control networks have four accuracy ratings:third order,fourth order,Class I,and Class II.
3.1.3 In the primary horizontal control network,the RMSE of the weakest point shall not exceed 5cm.
3.1.4 The primary horizontal control network shall be arranged in accordance with the following requirements:
1 The primary horizontal control network shall be planned comprehensively and cost-effectively according to the specific local conditions.
2 The primary horizontal control network shall be correlated with national or regional coordinate systems in accordance with Appendix A to this code.
3 Prior to surveys,data collection and reconnaissance survey shall be performed,and design optimization and accuracy estimation shall be made on drawings according to comprehensive analysis of the collected control survey data and topographic maps.
4 The accuracy and observation procedure for primary horizontal control network shall be determined reasonably based on the project scale,but it shall not be lower than the fourth order.
3.1.5 Horizontal control networks should be established based on the national horizontal coordinate system.To the extent that the deformation of projected length in the survey area is no more than 1/40000,the following horizontal coordinate systems may be used as appropriate:
1 Universal Gauss coordinate system with the meridian strips 3° wide;
2 Gauss conformal coordinate system with 3° wide meridian strips,the datum being the projection plane with compensation effect or the average elevation plane of survey area;or Gauss conformal coordinate system with any width meridian strips,the datum being the National Height datum 1985.
3 Independent coordinate systems may be used for small-sized survey areas or control networks with special accuracy requirements.
4 In areas where horizontal control networks are available,such coordinate systems may be used.
5 Within the station site,building coordinate system may be used.
- GB50460-2015 油氣輸送管道跨越工程施工規(guī)范
- 中文版Rhino 5.0完全自學(xué)教程(培訓(xùn)教材版)
- GB/T 51338-2018 分布式電源并網(wǎng)工程調(diào)試與驗(yàn)收標(biāo)準(zhǔn)
- GB/T 50554-2017 煤炭工業(yè)礦井工程建設(shè)項(xiàng)目設(shè)計文件編制標(biāo)準(zhǔn)
- DL/T5161.1-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評定規(guī)程第1部分:通則(英文版)
- GB 51185-2016 煤炭工業(yè)礦井抗震設(shè)計規(guī)范
- DL/T5161.6-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評定規(guī)程第6部分:接地裝置施工質(zhì)量檢驗(yàn)(英文版)
- GB 50471-2018 煤礦瓦斯抽采工程設(shè)計標(biāo)準(zhǔn)
- 巖土靜力載荷試驗(yàn)規(guī)程
- GB50377-2006選礦機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范(英文版)
- GB 51006-2014 石油化工建(構(gòu))筑物結(jié)構(gòu)荷載規(guī)范(英文版)
- GB50764-2012電廠動力管道設(shè)計規(guī)范(英文版)
- GB/T 51175-2016 煉油裝置火焰加熱爐工程技術(shù)規(guī)范
- GB 50426-2016 印染工廠設(shè)計規(guī)范
- GB50071-2014小型水力發(fā)電站設(shè)計規(guī)范(英文版)