3 Horizontal Control Survey
3.1 General Provisions
3.1.1 The horizontal control network may be established using methods including satellite positioning survey,traverse survey and triangulation survey.
3.1.2 Horizontal control networks have four accuracy ratings:third order,fourth order,Class I,and Class II.
3.1.3 In the primary horizontal control network,the RMSE of the weakest point shall not exceed 5cm.
3.1.4 The primary horizontal control network shall be arranged in accordance with the following requirements:
1 The primary horizontal control network shall be planned comprehensively and cost-effectively according to the specific local conditions.
2 The primary horizontal control network shall be correlated with national or regional coordinate systems in accordance with Appendix A to this code.
3 Prior to surveys,data collection and reconnaissance survey shall be performed,and design optimization and accuracy estimation shall be made on drawings according to comprehensive analysis of the collected control survey data and topographic maps.
4 The accuracy and observation procedure for primary horizontal control network shall be determined reasonably based on the project scale,but it shall not be lower than the fourth order.
3.1.5 Horizontal control networks should be established based on the national horizontal coordinate system.To the extent that the deformation of projected length in the survey area is no more than 1/40000,the following horizontal coordinate systems may be used as appropriate:
1 Universal Gauss coordinate system with the meridian strips 3° wide;
2 Gauss conformal coordinate system with 3° wide meridian strips,the datum being the projection plane with compensation effect or the average elevation plane of survey area;or Gauss conformal coordinate system with any width meridian strips,the datum being the National Height datum 1985.
3 Independent coordinate systems may be used for small-sized survey areas or control networks with special accuracy requirements.
4 In areas where horizontal control networks are available,such coordinate systems may be used.
5 Within the station site,building coordinate system may be used.
- GB 50260-2013 電力設施抗震設計規范(英文版)
- GB 50349-2015 氣田集輸設計規范
- GB 51138-2015 尿素造粒塔工程施工及質量驗收規范
- GB/T 51183-2016 農業溫室結構荷載規范
- GB50377-2006選礦機械設備工程安裝驗收規范(英文版)
- GB/T 51266-2017 機械工廠年時基數設計標準
- GB/T 50761-2018 石油化工鋼制設備抗震設計標準
- DL/T 5508-2015 燃氣分布式供能站設計規范
- GB/T51154-2015海底光纜工程設計規范(英文版)
- GB 50545-2010110kV~750kV架空輸電線路設計規范(英文版)
- GB 51184-2016 礦山提升井塔設計規范
- 標準貫入試驗規程
- 巖土工程勘察圖式圖例規程
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規范
- 鉆探、井探、槽探操作規程