官术网_书友最值得收藏!

4.10 Pump and Pump Set

4.10.1 The installation of pumps and pump sets shall comply with the following requirements:

1 The longitudinal and horizontal center lines shall be adjusted,and the measurement by plumb wire should be carried out,with the allowable deviation of 10.0mm.

2 The elevation shall be adjusted,and the measurement by optical instrument or ruler should be carried out,with the allowable deviation of±10.0mm.

3 The axial levelness shall be adjusted,and the measurement by leveler should be carried out,with the allowable deviation of 0.1/1000 for centrifugal pump and 0.5/1000 for positive displacement pump.

4 The horizontal levelness shall be adjusted,and the measurement by leveler should be carried out,with the allowable deviation of 0.2/1000 for centrifugal pump and 0.5/1000 for positive displacement pump.

4.10.2 The assembly of couplings shall conform to related requirements of the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).

主站蜘蛛池模板: 当涂县| 临桂县| 麻江县| 玛沁县| 毕节市| 齐河县| 蕲春县| 新余市| 新闻| 玉门市| 托克托县| 乌什县| 黄石市| 桐庐县| 北辰区| 聂拉木县| 家居| 广州市| 墨脱县| 英德市| 林西县| 宜阳县| 平凉市| 扎赉特旗| 蓝田县| 湟中县| 两当县| 滦南县| 林甸县| 杨浦区| 合山市| 普格县| 日土县| 广州市| 深圳市| 桑植县| 海盐县| 兴城市| 全南县| 伊金霍洛旗| 广南县|