- GB 50260-2013 電力設(shè)施抗震設(shè)計(jì)規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 173字
- 2021-04-20 11:16:59
6.5 Electrical Facilities Arrangement
6.5.1 The arrangement of electrical facilities shall be determined through techno-economic analysis based on the seismic precautionary intensity,site conditions and other environmental conditions and in combination with the electrical general layout and operation and maintenance conditions.
6.5.2 When the seismic precautionary intensity is 8 degree or above,the electrical facilities should be arranged according to the following requirements:
1 For 110kV and above switchgears,high-profile,semi-high profile or two-storey indoor arrangement should not be adopted.
2 The tubular busbars of 110kV and above switchgears should be suspended.
3 110kV and above equipment may be arranged depending on the product shape when the seismic strength verification testing requirements given in Article 6.4.1 are met.
6.5.3 When the seismic precautionary intensity is 8 degree or above,the capacitor platform of 110kV and above capacitive compensator should be suspended.
6.5.4 When the seismic precautionary intensity is 8 degree or above,the dry-type air-core reactor should not be arranged with its three phases vertically arranged.
- GB/T 50381-2018 城市軌道交通自動售檢票系統(tǒng)工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)
- GB50526-2010公共廣播系統(tǒng)工程技術(shù)規(guī)范(英文版)
- GB 51227-2017 立井鉆井法施工及驗(yàn)收規(guī)范
- GB/T 51132-2015 工業(yè)有色金屬管道工程施工及質(zhì)量驗(yàn)收規(guī)范
- 機(jī)械基礎(chǔ)地基動力特性測試規(guī)程
- GB 51184-2016 礦山提升井塔設(shè)計(jì)規(guī)范
- 電子CAD技術(shù)項(xiàng)目化教程
- 汽車故障診斷技巧與禁忌速查手冊
- 平板玻璃工廠節(jié)能設(shè)計(jì)標(biāo)準(zhǔn)
- SH/T 3096-2012 高硫原油加工裝置設(shè)備和管道設(shè)計(jì)選材導(dǎo)則 (英文版)
- GB/T 50312-2016 綜合布線系統(tǒng)工程驗(yàn)收規(guī)范
- DL/T5161.12-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評定規(guī)程第12部分:低壓電器施工質(zhì)量檢驗(yàn)(英文版)
- GB50078-2008煙囪工程施工及驗(yàn)收規(guī)范(英文版)
- GB 50384-2016 煤礦立井井筒及硐室設(shè)計(jì)規(guī)范
- YS/T 5420-2014 有色金屬工業(yè)通用設(shè)備安裝工程質(zhì)量檢驗(yàn)評定標(biāo)準(zhǔn)