Key performance indicators
Within a BA project (strategy and value chain models), there are three different types of KPIs that can be defined:
- Manual KPI: This allows us to enter a known value
- Rollup KPI: This evaluates an aggregate of the child KPIs
- External KPI: This provides a way to include KPI data from applications other than BPM Suite, such as SAP, E-Business Suite, PeopleSoft, and so on.
Additionally, KPIs can be defined on a BPMN process level, which is not covered in this chapter.
KPIs in the value chain step level
The following are the steps to configure the KPIs in the value chain step level:
- Open the value chain model Rental Request-to-Delivery.
- Right-click on the Vehicle Reservation & Allocation chain step, and select KPI.
- Click on the + (plus) sign to create a manual KPI, as illustrated in the next screenshot.
The following image shows the configuration of the KPIs:

Figure 13: Configuring a KPI
推薦閱讀
- Visual C++程序設(shè)計(jì)學(xué)習(xí)筆記
- Software Defined Networking with OpenFlow
- 零基礎(chǔ)玩轉(zhuǎn)區(qū)塊鏈
- PHP 編程從入門到實(shí)踐
- 你必須知道的204個(gè)Visual C++開發(fā)問(wèn)題
- Visual Basic學(xué)習(xí)手冊(cè)
- Web程序設(shè)計(jì)(第二版)
- GeoServer Beginner's Guide(Second Edition)
- 零基礎(chǔ)入門學(xué)習(xí)Python
- Hands-On Natural Language Processing with Python
- Windows內(nèi)核編程
- Building Wireless Sensor Networks Using Arduino
- Web前端應(yīng)用開發(fā)技術(shù)
- Java 9 with JShell
- RESTful Web API Design with Node.js