- Implementing Cisco UCS Solutions(Second Edition)
- Anuj Modi Farhan Nadeem Prasenjit Sarkar
- 106字
- 2021-07-02 23:51:16
Installing UCS chassis and components
Care must be taken during the installation of all components as failure to follow installation procedures may result in component malfunction and bodily injury.
UCS chassis don'ts:
Do not try to lift even the empty chassis alone. At least two people are required to handle a UCS chassis.
Do not handle internal components such as CPU, RAM, and mezzanine cards without an ESD field kit.
Physical installation is pided into three sections:
- Blade server component (CPU, memory, hard drives, and mezzanine card) installation
- Chassis and component (blade servers, IOMs, fan units, and power supplies) installation
- Fabric Interconnect installation and physical cabling
推薦閱讀
- 大數(shù)據(jù)導(dǎo)論:思維、技術(shù)與應(yīng)用
- PPT,要你好看
- 21天學(xué)通JavaScript
- 會聲會影X5視頻剪輯高手速成
- IoT Penetration Testing Cookbook
- 21天學(xué)通C++
- 大學(xué)C/C++語言程序設(shè)計基礎(chǔ)
- 奇點(diǎn)將至
- Working with Linux:Quick Hacks for the Command Line
- 簡明學(xué)中文版Photoshop
- 貫通開源Web圖形與報表技術(shù)全集
- Photoshop CS4數(shù)碼照片處理入門、進(jìn)階與提高
- 步步驚“芯”
- 30天學(xué)通Java Web項(xiàng)目案例開發(fā)
- 信息系統(tǒng)安全保障評估