Implement phase

In the implement phase, the goal is to integrate devices and new capabilities in accordance with the design and without compromising network availability or performance. The implementation phase is where the actual implementation of the design starts. This phase includes deploying the network equipment and configuring it.

Site audits are reviewed and the actual implementation of the devices, including rack and stack power on testing is done in this stage. Some of the documents required for this stage include detailed installation documents for each type of equipment and the test process for each device type. Further, Network Implementation Plan (NIP) documents are created that are detailed documents for each site that is a part of the network. These documents lay down the list of equipment to be deployed at the site, the rack layouts, port connectivity diagrams, and the actual device configurations, along with the IP addressing and other variable parameters for each device at the site. The configurations are derived based on the configuration templates that were created and tested in the design phase. This document becomes the reference document for the implementation engineer who has to simply download the configuration onto the new devices and conduct the tests that are specific to the site.

Once all sites are up and ready, and the WAN connectivity is established, end-to-end service testing is conducted based on the NRFU test cases.

Any migration of existing services or any integration of networks with the existing network infrastructure is also carried out in this phase and the success validated against the test cases as defined in the NRFU document.

主站蜘蛛池模板: 南开区| 榕江县| 东宁县| 康马县| 长子县| 凤台县| 清丰县| 巫溪县| 昌乐县| 武穴市| 伊川县| 龙海市| 潜江市| 潮安县| 松滋市| 安陆市| 德安县| 崇明县| 武宁县| 浮山县| 平凉市| 广元市| 盖州市| 罗甸县| 蒙山县| 通河县| 文安县| 中山市| 深水埗区| 全州县| 贵德县| 繁峙县| 荣昌县| 昆明市| 兴和县| 合阳县| 塔河县| 汶川县| 沙河市| 峨眉山市| 如皋市|