官术网_书友最值得收藏!

4.4 Submerged Equipment

4.4.1 Submerged equipments may include submarine repeater,BU,gain equalizer,etc..

4.4.2 In addition to meeting the dimensional requirements of the cable-laying equipment of the cable installation ship,the water pressure resistance requirements at the maximal depth of the waters where the project is located,and the high dielectric strength requirements,submerged equipment shall also meet the following requirements:

1 The repeater shall have surge protection for the power feeding system;

2 Important components of the repeater and BU shall be configured in redundancy to meet the requirement for system reliability;

3 The repeater shall have a self-monitoring loop or a C-OTDR monitoring loop;

4 Based on system topology,BUs shall have a fiber splitting or OADM function as appropriate;

5 Based on the topology of the power feeding system,BUs shall have the power feeding line switching function when necessary;

6 BUs that have the power feeding line switching function shall have surge protection;and

7 Gain equalizers may provide equalization of the residual gain tilt or slope based on the submerged plant gain profile characteristics.

主站蜘蛛池模板: 宝应县| 讷河市| 金山区| 潮安县| 台前县| 衡南县| 临安市| 营口市| 正安县| 永济市| 石首市| 辽阳市| 天峨县| 科技| 古蔺县| 阿拉善盟| 安康市| 晋中市| 东光县| 都昌县| 偃师市| 修文县| 酒泉市| 铁力市| 汤阴县| 泗阳县| 上虞市| 高青县| 甘谷县| 五原县| 大厂| 肇源县| 通道| 西贡区| 西青区| 长海县| 蒲城县| 蓬安县| 尤溪县| 桃园县| 定南县|