官术网_书友最值得收藏!

4 Waste Heat Resource,Thermodynamic System and Installed Capacity

4.1 Waste Heat Resource

4.1.1 The design of waste heat power generation system shall confirm the reasonable quantity of waste heat resource in accordance with the requirement of cement production technology and the principle of waste heat gradient utilization.

4.1.2 The thermal condition calibration of cement production line and calculation method of waste heat resources shall meet the relevant requirements of the current national standards Measuring methods of heat balance of cement rotary kiln GB/T 26282 and Methods for the calculation heat balance,heat efficiency and comprehensive energy consumption of cement rotary kiln GB/T 26281.

主站蜘蛛池模板: 美姑县| 胶州市| 石门县| 扶风县| 荣成市| 松桃| 凌云县| 泰顺县| 大竹县| 彩票| 杂多县| 东乡县| 新沂市| 西乌珠穆沁旗| 焦作市| 宁蒗| 衡南县| 宁安市| 海口市| 龙海市| 西林县| 五原县| 三门县| 涟源市| 岳普湖县| 柳河县| 颍上县| 遂川县| 赤壁市| 双城市| 西乡县| 勐海县| 腾冲县| 同德县| 临夏市| 林芝县| 大悟县| 南召县| 阿勒泰市| 扶沟县| 吉隆县|