4.6 Oil Tank
4.6.1 The installation of oil tank shall comply with the following requirements:
1 The longitudinal and horizontal center lines shall be adjusted,and the measurement by plumb wire should be carried out,with the allowable deviation of 10.0mm.
2 The elevation shall be adjusted,and the measurement by optical instrument or ruler should be carried out,with the allowable deviation of±10.0mm.
3 The levelness or verticality shall be adjusted,and the measurement by leveler or suspension wire should be carried out,with the allowable deviation of 1.5/1000.
4.6.2 The oil tank shall be cleaned up so as to be free of any visible pollutants inside.After being determined as qualified upon checking,it shall be timely sealed.
4.6.3 The pressure test shall be carried out to the cooler and steam heater of the oil tank according to the requirement of 4.7.2 of the Code.
- GB/T 50381-2018 城市軌道交通自動(dòng)售檢票系統(tǒng)工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)
- 中文版Rhino 5.0完全自學(xué)教程(培訓(xùn)教材版)
- GB50713-2011板帶精整工藝設(shè)計(jì)規(guī)范(英文版)
- GB/T51167-2016海底光纜工程驗(yàn)收規(guī)范(英文版)
- 電力調(diào)度數(shù)據(jù)網(wǎng)絡(luò)工程設(shè)計(jì)規(guī)程
- GB/T51050-2014鋼鐵企業(yè)能源計(jì)量和監(jiān)測(cè)工程技術(shù)規(guī)范(英文版)
- GB/T 50441-2016 石油化工設(shè)計(jì)能耗計(jì)算標(biāo)準(zhǔn)
- GB/T 51264-2017 雙向拉伸薄膜工廠(chǎng)設(shè)計(jì)標(biāo)準(zhǔn)
- GB 50084-2017 自動(dòng)噴水滅火系統(tǒng)設(shè)計(jì)規(guī)范
- DL/T 5221-2016 城市電力電纜線(xiàn)路設(shè)計(jì)技術(shù)規(guī)定
- GB 51222-2017 城鎮(zhèn)內(nèi)澇防治技術(shù)規(guī)范
- GB50427-2015高爐煉鐵工程設(shè)計(jì)規(guī)范(英文版)
- DL/T5232-2010±800kV及以下直流換流站電氣裝置安裝工程施工及驗(yàn)收規(guī)程(英文版)
- DL/T 5501-2015 凍土地區(qū)架空輸電線(xiàn)路基礎(chǔ)設(shè)計(jì)技術(shù)規(guī)程
- 計(jì)算機(jī)自適應(yīng)語(yǔ)言測(cè)試模型設(shè)計(jì)與效度驗(yàn)證