3 Process and Equipment
3.1 General Requirement
3.1.1 Newly constructed or renovated blast furnace must install PCI facility.
3.1.2 PCI shall be applied with high air temperature,and oxygen-enriched blast should be used.
3.1.3 Coal shall be chosen from the following types:anthracites;and among bituminous coals,meager coal,non-caking coal,long flame coal,meager lean coal and weakly caking coal(caking index≤40).
3.1.4 PCI shall use coal according to the actual condition of local coal resources,and may use blended coal as well as either anthracite or bituminous coal alone.
3.1.5 PCI facility should use direct injection,and shall be placed close to the BF in the general layout.
推薦閱讀
- 城市地下空間規劃標準
- GB 50227-2017 并聯電容器裝置設計規范
- DL/T 5508-2015 燃氣分布式供能站設計規范
- GB50439-2015煉鋼工程設計規范(英文版)
- 電子CAD技術項目化教程
- 建筑衛生陶瓷工廠節能設計標準
- 《電氣裝置安裝工程 低壓電器施工及驗收規范》實施指南
- GB/T 50459-2017 油氣輸送管道跨越工程設計標準
- NB/T 25046-2015 核電廠水工設計規范
- GB/T 50398-2018 無縫鋼管工程設計標準
- 中國綠色工業年鑒2020
- GB/T 51223-2017 公共建筑標識系統技術規范
- GB/T 51280-2018 工程泥沙設計標準
- 中國磁光電混合存儲產業藍皮書
- GB/T 51325-2018 煤焦化粗苯加工工程設計標準