- GB50541-2009鋼鐵企業(yè)原料場工藝設(shè)計(jì)規(guī)范(英文版)
- 中國冶金建設(shè)協(xié)會
- 94字
- 2020-09-25 15:29:37
4 Receiving
4.1 Basic Requirements
4.1.1 The receiving systems of coking coal and other raw materials should be separated.
4.1.2 The receiving belt conveyor system shall be equipped with weighing scales,metal extractors and sampling devices.
4.1.3 Rainproof shelters shall be provided for underground receiving bins,with bin wall inclination being not less than 60o.
4.1.4 Metallic grates must be provided at the gate of the receiving bins.
4.1.5 Anti-clogging devices shall be provided under the receiving bins.Frozen lump crusher should be provided on the steel grates of the receiving bins in cold regions.
推薦閱讀
- 產(chǎn)品首版制作
- 健康座椅
- 建筑工程綠色監(jiān)理
- 焊接技能實(shí)訓(xùn)
- 高素質(zhì)應(yīng)用型工程技術(shù)人才培養(yǎng)理論與實(shí)踐探索
- 從零開始學(xué)數(shù)字電路
- 電磁式流量傳感器測量方法及理論
- 鐵路客車檢查量具及應(yīng)用技術(shù)
- 寧波城市軌道交通設(shè)計(jì)技術(shù)標(biāo)準(zhǔn)
- 工程師創(chuàng)新手冊(進(jìn)階):CAFE-TRIZ方法與知識庫應(yīng)用
- 汽車故障診斷技巧與禁忌速查手冊
- 電子CAD技術(shù)項(xiàng)目化教程
- 移動(dòng)通信基站塔(桿)、機(jī)房及配套設(shè)施建設(shè)標(biāo)準(zhǔn)(上海市工程建設(shè)規(guī)范)
- 鄭州軌道交通機(jī)電設(shè)備運(yùn)營需求標(biāo)準(zhǔn)
- 鄭州軌道交通安裝工藝運(yùn)營需求標(biāo)準(zhǔn)