官术网_书友最值得收藏!

Foreword

The standard series DL/T 5210 Code for Construction Quality Acceptance and Evaluation of Electric Power Construct consists of 8 parts:

—DL/T 5210.1 Part 1:Civil Work

—DL/T 5210.2 Part 2:Boiler Unit

—DL/T 5210.3 Part 3:Steam Turbine Generator Unit

—DL/T 5210.4 Part 4:Instrumentation and Control

—DL/T 5210.5 Part 5:Piping & System

—DL/T 5210.6 Part 6:Water Treatment/Hydrogen Generation Equipment and System

—DL/T 5210.7 Part 7:Welding

—DL/T 5210.8 Part 8:Processing Preparation

This Part is the fourth part of DL/T 5210.

This Part is formulated by the National Development and Reform Commission according to the requirements of the document Announcement on Issuing the Professional Standard Project Planning in 2008(Fagaiban Gongye[2008]No.1242).

During the drafting procedure,this Part references the content of Standard for Quality Inspection and Evaluation of Thermal Power Construction-Part of Thermal Meters and Control Devices(Dianzong[1998]No.145).

Appendix A,Appendix B,Appendix C,Appendix D,Appendix E and Appendix F in this Part are normative.

Appendix G,Appendix H,Appendix I,Appendix J,Appendix K,Appendix L and Appendix M in this Part are informative.

This Part is proposed by the China Electricity Council.

The Technical Committee for Standardization of Thermal Power Construction in power industry is under the jurisdiction of and in charge of the explanation of this Part.

Chief Drafting Organizations:

      Guangdong Power Engineering Corporation

      First Electric Power Construction Company of Jiangsu Province

Participating Organizations:

      Beijing Electric Power Construction Company

      Northeast China Power Administration-No.1 Engineering Corporation

      Northwestern Electric Power Construction Group Company

      Zhejiang Electric Power Test & Research Institute

Chief Drafting Staff:

      Fan Youlin Chen Fayu Guo Wei Ye Mingjia Wen Zhiguo Gong Jianhua

      Liu Aimin Cai Qibin Tian Zhiqun Liu Qiang Lang Guocheng Sun Changsheng

The former Standard for Quality Inspection and Evaluation of Thermal Power Construction-Part of Thermal Meters and Control Devices(Dianzong[1998]No.145)shall be abolished on the issuing date of this Part.

During the process of implementing this Part,the relevant opinions and advice,whenever necessary,can be posted or passed on to the Standardization Center of the China Electricity Council(No.1,Baiguang Road Ertiao,Beijing,100761,China).

主站蜘蛛池模板: 应城市| 安顺市| 台中市| 上林县| 乐陵市| 石渠县| 泰兴市| 沙洋县| 抚宁县| 志丹县| 钟祥市| 屏东市| 琼海市| 凌源市| 修文县| 台前县| 泊头市| 全州县| 乳源| 乌兰县| 福州市| 六枝特区| 惠安县| 汕尾市| 综艺| 南澳县| 故城县| 分宜县| 德江县| 乐都县| 莱阳市| 丽水市| 湛江市| 安远县| 浦江县| 垣曲县| 苍南县| 芜湖县| 合肥市| 繁峙县| 张家川|