4.3 Sea Level Anomaly
4.3.1 For a coastal nuclear power plant,the effects of sea level anomaly on the design basis flood level shall be analyzed for the service life of the plant.
4.3.2 The representative tide observation stations selected for analyzing sea level anomaly shall not be exposed to effects of river runoff and human activities.And the tidal data obtained shall be analyzed for reliability and consistency.
4.3.3 The sea level change trend shall be analyzed after filtering the cyclical factors that may be contained in the monthly average sea level data.
4.3.4 The sea level change trend shall be determined based on the comprehensive analysis of results of related studies conducted in China.Based on the annual change rate thus obtained,the relative change range in the sea area neighboring the plant site shall be estimated for the design service life of the nuclear power plant.The sea level change and trend forecast can also be obtained from the announcement issued by national ocean authorities.
- GB50551-2010球團(tuán)機(jī)械設(shè)備安裝工程質(zhì)量驗(yàn)收規(guī)范(英文版)
- GB50713-2011板帶精整工藝設(shè)計(jì)規(guī)范(英文版)
- DL/T 5491-2014 電力工程交流不間斷電源系統(tǒng)設(shè)計(jì)技術(shù)規(guī)程
- DL/T 5544-2018 架空輸電線路錨桿基礎(chǔ)設(shè)計(jì)規(guī)程
- 電磁式流量傳感器測(cè)量方法及理論
- GB 51138-2015 尿素造粒塔工程施工及質(zhì)量驗(yàn)收規(guī)范
- GB 51179-2016 煤礦井下煤炭運(yùn)輸設(shè)計(jì)規(guī)范
- DL/T 5508-2015 燃?xì)夥植际焦┠苷驹O(shè)計(jì)規(guī)范
- GB 51214-2017 煤炭工業(yè)露天礦邊坡工程監(jiān)測(cè)規(guī)范
- GB50764-2012電廠動(dòng)力管道設(shè)計(jì)規(guī)范(英文版)
- GB/T 50938-2013 石油化工鋼制低溫儲(chǔ)罐技術(shù)規(guī)范(英文版)
- 電子CAD技術(shù)項(xiàng)目化教程
- 工業(yè)文化研究(第2輯):紀(jì)念改革開放四十年——中國(guó)工業(yè)的大轉(zhuǎn)型
- GB 50360-2016 水煤漿工程設(shè)計(jì)規(guī)范
- DL/T 5516-2016 火力發(fā)電廠集中控制室及電子設(shè)備間布置設(shè)計(jì)規(guī)程