2.1 General Requirement

2.1.1 This chapter is applicable to the construction and acceptance of installation engineering of steam turbine generator and synchronous var compensator with capacity of 6000kW and above in the powerhouse.

2.1.2 The position,dimension and quality,such as electrical machine foundation,anchor bolt,channel,hole,pre-embedded parts and cable,shall meet the requirements of design and current relevant standards of the nation.

2.1.3 There shall be two and above obvious earthing points for electrical machines with stripy base.