- GB50147-2010電氣裝置安裝工程高壓電器施工及驗收規范(英文版)
- 中華人民共和國住房和城鄉建設部
- 323字
- 2020-09-25 15:23:36
4.4 Transfer and Acceptance
4.4.1 During acceptance,the following inspections shall be carried out:
1 Breaker shall be firmly fixed;surface shall be clean and intact;operation performance shall meet the requirements in the technical documentations of the product.
2 Bolt fastening moment shall be reach the requirements in the technical documentations of the product.
3 Electric connection shall be reliable and good contact.
4 The linkage operation of breaker and operating device shall be normal without any jamming.Off/On indications of the switching shall be correct.Operation of auxiliary switch shall be correct and reliable.
5 The requirements of warning and blocking values of density monitor shall be meet with which specified in the technical documentations of the product;the transmission signal of electric circuit shall be correct.
6 The requirements of SF6 gas pressure,leakage rate and water content shall be meet with which specified in the current national standard GB 50150 Electric Equipment Installation Engineering Standard for Hand-over Test of Electric Equipment and the technical documentations of the product.
7 Porcelain bushing shall be intact,and surface shall be clean.
8 Rain-proof and damp-proof performance for all panels and boxes shall be good,so shall main body cable protection.
9 Earthing shall be good,and earthing marks shall be clear.
10 Handover test shall be qualified.
11 Equipment down lead connection shall be reliable and shall not make equipment wiring terminal to bear the stress exceeding allowable bearing stress.
12 Paint shall be intact;contrast mark shall be correct.
4.4.2 The following technical documentation shall be submitted during the acceptance:
1 Supporting documents related to the design alteration.
2 Technical documentation such as product description,packing list,test record,qualification document and assembly drawing provided by the manufacturer.
3 Acceptance information for inspection and quality.
4 Test report.
5 A list of spare parts,special tools and test instruments.
- GB51005-2014水泥工廠余熱發電工程施工與質量驗收規范(英文版)
- 健康座椅
- 海上風力發電場勘測標準
- GB 51177-2016 升船機設計規范
- 電力調度數據網絡工程設計規程
- DL/T5161.1-2002電氣裝置安裝工程質量檢驗及評定規程第1部分:通則(英文版)
- GB/T51050-2014鋼鐵企業能源計量和監測工程技術規范(英文版)
- GB50580-2010連鑄工程設計規范(英文版)
- 錦綸工廠設計標準
- DL/T 5156.1-2015 電力工程勘測制圖標準 第1部分:測量
- GB50071-2014小型水力發電站設計規范(英文版)
- DL/T 866-2015 電流互感器和電壓互感器選擇及計算規程
- DL/T 5516-2016 火力發電廠集中控制室及電子設備間布置設計規程
- GB 51171-2016 通信線路工程驗收規范
- 建筑施工技術(中職)