Foreword
This Part is revised from DL/T 5190.5-2004"Specification for thermal power erection and construction-Part 5:Section of instrumentation and control"by Professional Technical Committee on Thermal Power Construction of Standardization Administration of China,in association of relevant organizations according to the requirements of Document GUONENGKEJI〔2009〕No.163"Notice of National Energy Administration on Formulating(Revising)the First Batch of Professional Standard in the Energy Field in 2009".
DL 5190"Technical specification for thermal power erection and construction"comprises the following 9 parts:
DL 5190.1 Part 1:Civil Work
DL 5190.2 Part 2:Boiler Unit
DL 5190.3 Part 3:Steam Turbine Generator Units
DL 5190.4 Part 4:Instrumentation and Control
DL 5190.5 Part 5:Pipe and System
DL 5190.6 Part 6:Water Treatment and Hydrogen Generation Equipment and System
DL 5190.7 Part 7:Welding
DL 5190.8 Part 8:Processing Preparation
DL 5190.9 Part 9:Hydro-structure
This Part is the fourth part"Instrumentation and Control"of DL 5190(hereinafter referred to as"this Part").
The main contents of this Part include:General Principles,Basic Regulation,Installation of Sampling﹠ sensitive element,Installation of Local Measuring ﹠ Control Instrument,Installation of Control Panel(Console,Box,Cabinet),Laying and Wiring of Wires and Cables,Pipe Laying Work,Protection and Grounding,I﹠C Device Commissioning and appendixes.
This Part has the followingmain technical changes compared with DL 5190.5-2004:
—The compulsory provisions were specified;
—The contents on"pneumatic local-mounted instrument"in the former specification were deleted;
—Section 5.3"Computer and Auxiliary System Installation"was added in Chapter 5;
—The contents on the requirements for the technical data,like"list of installation records of thermal control equipments"and"list of commissioning records of thermal control equipments",were added in Chapter 9;
In this Part,Article 3.1.6 and Item 1~Item 3 in Article 8.4.12 printed in bold type are the compulsory provisions and must be enforced strictly.
This Part was proposed by the China Electricity Council.
This Part is under the jurisdiction of the Professional Technical Committee on Thermal Power Construction of Standardization Administration of China.
Chief Development Organizations:
The First Northeast Electric Power Engineering Co.and SEPCOIII Electric Power
Construction Corporation.
Participating Development Organizations:
Hebei No.1 Electric Power Construction Company,Guangdong Power Engineering
Corporation
The First Electric Power Construction Company of Jiangsu Province and Huaneng Power
International Inc..
Chief Drafting Staff:
Fan Youlin Han Yingming Liu Qiang Li Yajuan Ju Zhiqiang
Sun Lijie Gao Jihong Pei Sheng Chen Hongjun Wu Hechun
Lai Zhengmin.
Chief Examiners:
Jia Yanbing Duan Ximin Chen Fayu Luo Jiacong Ma Jun Dai Guang
Liao Guanghong Wang Wenxiang Chen Jikun Sun Huafang Gao Zhicun
Jiang Shouyi Zhang Gang Qian Youyi Xu Tongshe Chen Kuanhong
Wang Junshan Wan Hui Ji Wenjun Luo Zhihao Bao Jiagui Liu Wenxin
Chen Zude
This Part shall replace DL/T 5190.5-2004"Specification for thermal power erection and construction-Part 5:Section of instrumentation and control"from the implementation date hereof.
During the process of implementing this Part,the relevant opinions and advices,whenever necessary,can be fed back to the China Electricity Council Standardization Center(Address:No.1,Baiguang Road Ertiao,Beijing,100761,China).
- DL/T 5044-2014 電力工程直流電源系統設計技術規程
- 老年人智能技術應用入門
- GB 51209-2016 發光二極管工廠設計規范
- GB/T50609-2010石油化工工廠信息系統設計規范(英文版)
- GB50580-2010連鑄工程設計規范(英文版)
- GB 51258-2017 玻璃纖維工廠設計標準
- GB50629-2010板帶軋鋼工藝設計規范(英文版)
- DL/T5161.9-2002電氣裝置安裝工程質量檢驗及評定規程第9部分:蓄電池施工質量檢驗(英文版)
- 煤炭礦井工程基本術語標準
- DL/T 5160-2015 電力工程巖土描述技術規程
- DL/T 5516-2016 火力發電廠集中控制室及電子設備間布置設計規程
- GB 50825-2013 鋼鐵廠加熱爐工程質量驗收規范 (英文版)
- GB50967-2014焦化機械設備安裝規范(英文版)
- GB 51219-2017 禽類屠宰與分割車間設計規范
- YS/T 5430-2016 有色金屬工業建筑工程質量檢驗評定統一標準