7.3 Hydrocyclone

7.3.1 The installation of hydrocyclone shall be in accordance with the following requirements:

1 The maximum allowable deviation for longitudinal and horizontal centerlines shall be 5.0 mm;

2 The allowable deviation for feeding pipe center elevation shall be±10.0mm;

3 The maximum allowable deviation for perpendicularity shall be 1/1000;slanting installation shall comply with the requirements of equipment technical documents;

4 When installing in groups and rows,relative position difference shall be no more than 5.0mm;

5 Thermal cutting and welding shall not be carried out on the shell of cyclone with lining.

7.3.2 Test run shall meet the requirements of Article 3.0.11 in this code.