7.3 Hydrocyclone
7.3.1 The installation of hydrocyclone shall be in accordance with the following requirements:
1 The maximum allowable deviation for longitudinal and horizontal centerlines shall be 5.0 mm;
2 The allowable deviation for feeding pipe center elevation shall be±10.0mm;
3 The maximum allowable deviation for perpendicularity shall be 1/1000;slanting installation shall comply with the requirements of equipment technical documents;
4 When installing in groups and rows,relative position difference shall be no more than 5.0mm;
5 Thermal cutting and welding shall not be carried out on the shell of cyclone with lining.
7.3.2 Test run shall meet the requirements of Article 3.0.11 in this code.
推薦閱讀
- GB 51139-2015 纖維素纖維用漿粕工廠設(shè)計規(guī)范
- GB 51287-2018 煤炭工業(yè)露天礦土地復(fù)墾工程設(shè)計標(biāo)準(zhǔn)
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規(guī)范(英文版)
- GB/T 51331-2018 煤焦化焦油加工工程設(shè)計標(biāo)準(zhǔn)
- GB 50471-2018 煤礦瓦斯抽采工程設(shè)計標(biāo)準(zhǔn)
- GB/T 50643-2018 橡膠工廠職業(yè)安全衛(wèi)生設(shè)計標(biāo)準(zhǔn)
- GB 51006-2014 石油化工建(構(gòu))筑物結(jié)構(gòu)荷載規(guī)范(英文版)
- GB50439-2015煉鋼工程設(shè)計規(guī)范(英文版)
- 標(biāo)準(zhǔn)貫入試驗規(guī)程
- 電氣工程師手冊(第4版)
- 鐵路罐車清洗設(shè)施設(shè)計標(biāo)準(zhǔn)
- DL/T 5334-2016 電力工程勘測安全規(guī)程
- NB/T 25046-2015 核電廠水工設(shè)計規(guī)范
- 建材工程術(shù)語標(biāo)準(zhǔn)
- DL/T5236-2010±800kV及以下直流架空輸電線路工程施工質(zhì)量檢驗及評定規(guī)程(英文版)