7.2 Spiral Classifier
7.2.1 The installation of water tank base shall be in accordance with the following requirements:
1 The base is installed in place and aligned;the maximum allowable deviations for longitudinal and horizontal centerlines shall be 3.0 mm and 5.0mm respectively;
2 Adjust the base elevation and the height difference between bases.The allowable deviation for base elevation is±5.0 mm,and the relative height difference between bases shall be no more than 2mm;
3 The maximum allowable deviation for horizontal levelness of the upper surface of base shall be 1/1000.
7.2.2 The installation of water tank shall be in accordance with the following requirements:
1 Longitudinal and horizontal centerlines shall be adjusted according to the central standard plate,and the maximum allowable deviation shall be 3.0mm;
2 The maximum allowable deviation for the levelness of overflow weir shall be 1/1000;
3 The tail lifting device bracket shall be vertical to the tank bottom,and the maximum allowable deviation for perpendicularity shall be 1/1000;
4 The joint stagger for water tank shall not be more than 10% of the thickness of tank wall,and the maximum allowable diagonal deviation for assembling water tank shall be 10.0mm.
7.2.3 The installation of field-assembled transmission mechanism of double spiral classifier(Fig.7.2.3)shall be in accordance with the following requirements:
1 The maximum allowable deviation for transmission centerline AA relative to the horizontal centerline of the water tank shall be 2.0mm;
2 The maximum allowable deviation for the levelness of cone gear shaft shall be 0.1/1000;
3 The cone gear shaft shall be vertical to the longitudinal centerline BB of classifier,and the maximum allowable deviation for perpendicularity shall be 0.2/1000;
4 The maximum allowable deviation for coaxiality of bearings on the transmission centerline AA shall be 0.2mm.When installing screw,the meshing of cone gear shall be in accordance with the requirements of technical documents;
5 The allowable deviation for distances a and a′from the crosshead bushing seats at the two sides to the longitudinal centerline BB of the spiral classifier shall be±1.0mm;
6 The allowable deviation for distances b and a′from the screw center of the lifting device to the longitudinal centerline BB of the spiral classifier shall be±3.0mm;
7 The installation of the main transmission shaft shall be in accordance with the technical requirements of meshing of transmission spur gear.
7.2.4 The installation of single spiral classifier shall meet the requirements of Article 7.2.3 in this code.
7.2.5 The gap between end cover of the screw tail bearing and tank wall shall meet the requirements of technical documents and shall be no less than 5.0mm if no design requirements available.
7.2.6 Test run shall be in accordance with the following requirements:
1 No-load test run shall meet the requirements of Article 3.0.11 in this code;
2 The total travel actions of lifting device shall be 6 times.

Fig.7.2.3 Transmission Mechanism of Double Spiral Classifier
1-Tail bearing;2-Screw shaft;3-Crosshead;4-Cone gear shaft;5-Main drive shaft
- GB/T 50381-2018 城市軌道交通自動售檢票系統工程質量驗收標準
- 鋼鐵企業原料場工程設計標準
- GB 51180-2016 煤礦采空區建(構)筑物地基處理技術規范
- GB50713-2011板帶精整工藝設計規范(英文版)
- GB 50227-2017 并聯電容器裝置設計規范
- GB 50428-2015 油田采出水處理設計規范
- GB 51326-2018 鈦冶煉廠工藝設計標準
- DL/T 5502-2015 串補站初步設計文件內容深度規定
- GB50377-2006選礦機械設備工程安裝驗收規范(英文版)
- GB50049-2011小型火力發電廠設計規范(英文版)
- 石油化工廠際管道工程技術標準
- GB/T 51132-2015 工業有色金屬管道工程施工及質量驗收規范
- DL/T 5160-2015 電力工程巖土描述技術規程
- DL/T 5334-2016 電力工程勘測安全規程
- GB50679-2011煉鐵機械設備安裝規范(英文版)