7.2 Spiral Classifier
7.2.1 The installation of water tank base shall be in accordance with the following requirements:
1 The base is installed in place and aligned;the maximum allowable deviations for longitudinal and horizontal centerlines shall be 3.0 mm and 5.0mm respectively;
2 Adjust the base elevation and the height difference between bases.The allowable deviation for base elevation is±5.0 mm,and the relative height difference between bases shall be no more than 2mm;
3 The maximum allowable deviation for horizontal levelness of the upper surface of base shall be 1/1000.
7.2.2 The installation of water tank shall be in accordance with the following requirements:
1 Longitudinal and horizontal centerlines shall be adjusted according to the central standard plate,and the maximum allowable deviation shall be 3.0mm;
2 The maximum allowable deviation for the levelness of overflow weir shall be 1/1000;
3 The tail lifting device bracket shall be vertical to the tank bottom,and the maximum allowable deviation for perpendicularity shall be 1/1000;
4 The joint stagger for water tank shall not be more than 10% of the thickness of tank wall,and the maximum allowable diagonal deviation for assembling water tank shall be 10.0mm.
7.2.3 The installation of field-assembled transmission mechanism of double spiral classifier(Fig.7.2.3)shall be in accordance with the following requirements:
1 The maximum allowable deviation for transmission centerline AA relative to the horizontal centerline of the water tank shall be 2.0mm;
2 The maximum allowable deviation for the levelness of cone gear shaft shall be 0.1/1000;
3 The cone gear shaft shall be vertical to the longitudinal centerline BB of classifier,and the maximum allowable deviation for perpendicularity shall be 0.2/1000;
4 The maximum allowable deviation for coaxiality of bearings on the transmission centerline AA shall be 0.2mm.When installing screw,the meshing of cone gear shall be in accordance with the requirements of technical documents;
5 The allowable deviation for distances a and a′from the crosshead bushing seats at the two sides to the longitudinal centerline BB of the spiral classifier shall be±1.0mm;
6 The allowable deviation for distances b and a′from the screw center of the lifting device to the longitudinal centerline BB of the spiral classifier shall be±3.0mm;
7 The installation of the main transmission shaft shall be in accordance with the technical requirements of meshing of transmission spur gear.
7.2.4 The installation of single spiral classifier shall meet the requirements of Article 7.2.3 in this code.
7.2.5 The gap between end cover of the screw tail bearing and tank wall shall meet the requirements of technical documents and shall be no less than 5.0mm if no design requirements available.
7.2.6 Test run shall be in accordance with the following requirements:
1 No-load test run shall meet the requirements of Article 3.0.11 in this code;
2 The total travel actions of lifting device shall be 6 times.

Fig.7.2.3 Transmission Mechanism of Double Spiral Classifier
1-Tail bearing;2-Screw shaft;3-Crosshead;4-Cone gear shaft;5-Main drive shaft
- GB/T51075-2015選礦機(jī)械設(shè)備工程安裝規(guī)范(英文版)
- GB/T51050-2014鋼鐵企業(yè)能源計量和監(jiān)測工程技術(shù)規(guī)范(英文版)
- GB/T 50441-2016 石油化工設(shè)計能耗計算標(biāo)準(zhǔn)
- GB 51220-2017 生活垃圾衛(wèi)生填埋場封場技術(shù)規(guī)范
- GB 51184-2016 礦山提升井塔設(shè)計規(guī)范
- GB50439-2015煉鋼工程設(shè)計規(guī)范(英文版)
- 巖土工程勘察圖式圖例規(guī)程
- 平板玻璃工廠節(jié)能設(shè)計標(biāo)準(zhǔn)
- GB50402-2007燒結(jié)機(jī)械設(shè)備工程安裝驗收規(guī)范(英文版)
- GB 51284-2018 煙氣脫硫工藝設(shè)計規(guī)范
- DL/T5231-2010±800kV及以下直流輸電接地極施工及驗收規(guī)程(英文版)
- GB/T 51248-2017 天然氣凈化廠設(shè)計規(guī)范
- GB 50825-2013 鋼鐵廠加熱爐工程質(zhì)量驗收規(guī)范 (英文版)
- 建筑廢棄物再生工廠設(shè)計標(biāo)準(zhǔn)
- DL/T 5501-2015 凍土地區(qū)架空輸電線路基礎(chǔ)設(shè)計技術(shù)規(guī)程