4 Approach of Raw Materials and Finished Products
4.1 General Requirements
4.1.1 This chapter is applicable for the site acceptance of main materials,parts/components,finished products,standard pieces and other products before they enter the construction site of every sub-item work of structure for mobile communication steel tower and mast.
4.1.2 In principle,the inspection lots for the site acceptance shall be in accordance with that of sub-item works.However,the inspection lots may be divided according to the scale of construction and the actual situation of charge-in.
4.1.3 Sets of high-strength bolt shall be acceptable according to the Code for acceptance of construction quality of steel structures(GB 50205-2001).
推薦閱讀
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- DL/T 5390-2014 發電廠和變電站照明設計技術規定
- GB50432-2007煉焦工藝設計規范(英文版)
- DL/T 5502-2015 串補站初步設計文件內容深度規定
- 滌綸工廠設計標準
- GB 50084-2017 自動噴水滅火系統設計規范
- GB 51006-2014 石油化工建(構)筑物結構荷載規范(英文版)
- GB 51258-2017 玻璃纖維工廠設計標準
- DL/T 5508-2015 燃氣分布式供能站設計規范
- 換流站接地極設計文件內容深度規定
- GB50439-2015煉鋼工程設計規范(英文版)
- GB/T 51218-2017 機械工業工程設計基本術語標準
- 發光二極管生產工藝設備安裝工程施工及質量驗收標準
- GB50475-2008石油化工全廠性倉庫及堆場設計規范(英文版)
- DL/T5161.11-2002電氣裝置安裝工程質量檢驗及評定規程第11部分:電梯電氣裝置施工質量檢驗(英文版)