6.3 Installation Requirements for Duct Optical Cables
6.3.1 The duct occupied by duct optical cables may prefer proper locations near both sides of the pipe group.The duct occupied by optical cables in each adjacent pipeline section shall be relatively consistent.When the location of the duct needs to change,the scope of change should not be too large and should avoid transferring from one side of the tube group to the other.
6.3.2 Plastic sub pipes shall be used to protect optical cables per actual situations when laying optical cables in pipes of cement,steel,pottery and ceramics or other similar materials.When optical cables are laid in plastic pipes,large diameter plastic pipes shall be used to contain multiple plastic sub pipes in order to increase the utilization rate of the ducts.
6.3.3 Installation of sub pipes shall be in accordance with the following requirements:
1 Sub pipes should adopt suitable materials such as plastics.
2 The quantity of sub pipes needs to be determined according to the diameter of the ducts and engineering needs,with the total equivalent diameter of the sub pipes not greater than 90% of the pipe diameter.
3 The sub pipes in one duct shall be installed at one time,and there shall be no joints in the pipe section between two man(hand)holes.
4 The sub pipes shall extend from man(hand)holes at appropriate length,usually may be 200mm-400mm.
5 Pipe ends shall adopt waterproof sealing if sub pipes are not used in the current project.
6.3.4 Optical cable closure in man(hand)holes should be installed above the perennial water level and protection trays or other bearing methods should be adopted.
6.3.5 Optical cables in man(hand)holes shall be fixed firmly and should be protected with plastic pipes,shall be marked with clear identification signs or cable labels.
6.3.6 Optical cables laid in special pipelines such as on highways,railways,bridges and construction projects with other large diameter pipelines in the same ditch,shall be properly protected,taking full consideration of various effects on cable lines including road surface subsidence,impacts and shocks,vibrations,structural deformation caused by severe temperature changes etc.
- GB 51145-2015 煤礦電氣設(shè)備安裝工程施工與驗(yàn)收規(guī)范
- GB 51289-2018 煤炭工業(yè)露天礦邊坡工程設(shè)計(jì)標(biāo)準(zhǔn)
- DL/T 5544-2018 架空輸電線路錨桿基礎(chǔ)設(shè)計(jì)規(guī)程
- GB/T 51183-2016 農(nóng)業(yè)溫室結(jié)構(gòu)荷載規(guī)范
- GB/T 50491-2018 鐵礦球團(tuán)工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB 51134-2015 煤礦瓦斯發(fā)電工程設(shè)計(jì)規(guī)范
- GB/T51154-2015海底光纜工程設(shè)計(jì)規(guī)范(英文版)
- GB 51136-2015 薄膜晶體管液晶顯示器工廠設(shè)計(jì)規(guī)范
- DL/T 5334-2016 電力工程勘測(cè)安全規(guī)程
- GB50427-2015高爐煉鐵工程設(shè)計(jì)規(guī)范(英文版)
- 鉆探、井探、槽探操作規(guī)程
- GB 51208-2016 人工制氣廠站設(shè)計(jì)規(guī)范
- NB/T 25046-2015 核電廠水工設(shè)計(jì)規(guī)范
- DL/T 5493-2014 電力工程基樁檢測(cè)技術(shù)規(guī)程
- DL/T5210.4-2009電力建設(shè)施工質(zhì)量驗(yàn)收及評(píng)價(jià)規(guī)程第4部分:熱工儀表及控制裝置(英文版)