6.1 General Principle
6.1.1 Optical cables shall be deployed and installed based on the environmental conditions of the locations to ensure that the cables remain undamaged.Artificial or mechanical installation method shall be adopted per the actual conditions.
6.1.2 During installation,special caution shall be exercised to avoid water from entering the optical cables and splice closures in order to maintain the integrity of optical cable sheath and ensure that the metal protection sheath of the buried optical cables is insulated.
6.1.3 The minimum installation curvature radius of optical cables shall be in accordance with those specified in Table 6.1.3.
Table 6.1.3 The minimum curvature radius allowed for optical cables

Note:D stands for diameter.
6.1.4 During installation,overlapping,increase of cable length and reserved length of optical cables can be determined per actual engineering practices,according to specifications in Table 6.1.4.
Table 6.1.4 Reference values for increased and reserved length of optical cables

6.1.5 The diameter of the cables through various types of pipes should not be more than 90% of the tube diameter.The nozzle shall be sealed tightly after installation.
6.1.6 Optical cables shall bear clear and permanent identity to be easily identified during operation and maintenance.In addition to characters,symbols and banners printed on the outer sheath of the optical cables,hanging signs shall be added to duct and aerial optical cables,and warning tapes may be added to directly buried cables.
- 產品首版制作
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- 健康座椅
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- 加油站在役油罐防滲漏改造工程技術標準
- DL/T5161.1-2002電氣裝置安裝工程質量檢驗及評定規程第1部分:通則(英文版)
- GB 50309-2017 工業爐砌筑工程質量驗收標準
- GB/T 51331-2018 煤焦化焦油加工工程設計標準
- DL/T 5512-2016 火力發電廠熱工檢測及儀表設計規程
- SH/T3143-2012石油化工往復壓縮機工程技術規范(英文版)
- 換流站接地極設計文件內容深度規定
- GB/T 50050-2017 工業循環冷卻水處理設計規范
- SH/T 3405-2012 石油化工鋼管尺寸系列(英文版)
- GB/T 50417-2017 煤礦井下供配電設計規范
- GB/T 51259-2017 腈綸設備工程安裝與質量驗收規范