2.1 Terms
2.1.1 Concrete-filled steel tube(CFST)arch bridge
A bridge whose main load-carrying component(s)is(are)concrete-filled steel tube(s)with a circular cross-section,which serve(s)as rib(s)for an arch.
2.1.2 CFST arch rib
An arch rib,whose main load-carrying element(s)is(are)concrete-filled steel tube(s).
2.1.3 Steel tube arch rib
An arch rib of a hollow steel tube without filling of concrete inside.
2.1.4 Concrete in tube(core concrete)
Concrete that is filled in a steel tube.
2.1.5 CFST member
A member that is made of CFST,in which the steel tube and the concrete core act compositely to resist loads.
2.1.6 Single tube arch rib
An arch rib that is formed by a single CFST member with a circular section.
2.1.7 Dumbbell-shaped arch rib
An arch rib that is formed by two top and bottom CFST members with circular section connected by two steel web plates.
2.1.8 Truss arch rib
An arch rib that is formed by top and bottom CFST chords connected by web members to form trusses.
2.1.9 Laced CFST column
A laced column that is formed by multiple CFST members connected transversely by hollow steel tubes.
2.1.10 Rigid-frame tied arch
An arch structure whose rib is rigidly connected to piers and the horizontal thrust is partially balanced by pre-stressed ties.
2.1.11 Rigid-frame tied through arch
A bridge structure whose deck system is suspended below the rigid-frame tied arch.
2.1.12 Rigid-frame tied half-through arch
A multi-span bridge structure whose deck system at the main span is partially suspended below the rigid-frame tied arch,while its deck systems at two side spans are supported above two cantilever half arches.The ties are anchored on each end of the side spans.It is also known as a flying-bird arch.
2.1.13 Confinement(hooping)coefficient
A coefficient accounts for the confinement effect of the steel tube on the concrete core.
2.1.14 Initial stress or Preloading of steel tube
The initial axial stress in a steel tube caused by loads due to sequential construction procedures before composite action is fully formed in the CFST members,it is also called initial stress or preloading of CFST.
2.1.15 Initial stressing ratio or preloading ratio
The ratio of preloading stress to the yield stress of the steel tube.
2.1.16 Computational closure temperature The average temperature in the cross section at the moment of zero thermal stress which is converted from the stresses in the CFST arch rib when the concrete core reaches its design strength.
2.1.17 Intersection joint
Intersection line welding joint connecting the main CFST tube(chord)with the branch tube(web truss).
2.1.18 Debonding
The phenomenon of separation of the steel tube from the concrete core that are attributed to factors other than quality issues including thermal gradient and shrinkage of the concrete core.
2.1.19 Debonding(angle)rate
The central angle(ratio)corresponding to the debonding region in the cross section of CFST members.
- GB 51276-2018 煤炭企業總圖運輸設計標準
- 高素質應用型工程技術人才培養理論與實踐探索
- DL/T5161.6-2002電氣裝置安裝工程質量檢驗及評定規程第6部分:接地裝置施工質量檢驗(英文版)
- GB 51137-2015 電子工業廢水廢氣處理工程施工及驗收規范
- DL/T 5512-2016 火力發電廠熱工檢測及儀表設計規程
- GB 50084-2017 自動噴水滅火系統設計規范
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗收規范
- DL/T 5156.1-2015 電力工程勘測制圖標準 第1部分:測量
- GB 51162-2016 重型結構和設備整體提升技術規范
- GB50227-2008并聯電容器裝置設計規范(英文版)
- 《電氣裝置安裝工程 低壓電器施工及驗收規范》實施指南
- GB50468-2008焊管工藝設計規范(英文版)
- SH/T 3096-2012 高硫原油加工裝置設備和管道設計選材導則 (英文版)
- GB 50414-2018 鋼鐵冶金企業設計防火標準
- 陽極焙燒爐用多功能機組安裝技術規程