Foreword
This Code is prepared by Northwest Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group in collaboration with organizations concerned as required by the Notice on Printing and Distributing the"Plan of Preparing and Revising National Standards for Engineering Construction of Yr.2004"(JB〔2004〕No.67)issued by the former Ministry of Construction of the People s Republic of China.
During the revision,the revision panel had undertaken extensive investigations and studies,summed up practical experience,collected suggestions and comments from all interests concerned,and finalized the draft after repeated discussions and review.
This Code is organized into eight chapters,including General Provisions,Terms and Symbols,Site,Site Selection and General Arrangement,Seismic Action for Electrical Facilities,Electrical Facilities,Buildings and Structures in Power Stations and Substations,and Transmission Tower and Microwave Tower.
The technical contents involved in this revision mainly include:
1.The chapter"Terms and Symbols"are added;
2.The applicable scope of this Code is revised;
3.Classification of sites is determined in accordance with the national standard Code for Seismic Design of Buildings GB 50011-2010,and the seismic influence coefficient is modified;
4.More specific requirements are put forward regarding the dynamic design methods,dynamic amplification factor of support,combination of load effects,seismic tests,etc.;
5.Seismic isolation and energy dissipation design of electrical equipment are added;
6.Requirements for layout of the reinforced concrete structure of main power house are added appropriately,and limitations on particularly irregular layout are proposed;contents of connection between the gallery and neighboring buildings(structures)that satisfies high seismic requirements are supplemented;and the design principles of towers subject to seismic calculation are clarified;
7.The seismic design criteria for electrical installations are improved as appropriate based on experience and lessons on damage of electrical installations and electrical equipment during Wenchuan earthquake;
8.Compulsory provisions are added.
In this Code,the articles in bold type are compulsory provisions and must be enforced strictly.
This Code is administered by Ministry of Housing and Urban-Rural Development of the People s Republic of China which will be responsible for the interpretation of compulsory provisions,and is routinely managed by the China Electricity Council.And Northwest Electric Power Design Institute of China Power Engineering Consulting Group is responsible for the interpretation of specific technical issues therein.During implementation of this Code,the interests concerned are expected to seriously summarize the experiences and collect the relevant information based on the project practices and at any time refer any comments and suggestions to Northwest Electric Power Design Institute of China Power Engineering Consulting Group at the address:No.22,Tuanjienan Road,High-tech Industrial Development Zone,Xi an,Postcode:710075,for reference in the future revision of this Code.
Chief development organization,participating development organizations,chief drafting staff and chief reviewing staff of this Code:
Chief Development Organization:
Northwest Electric Power Design Institute of China Power Engineering Consulting
Group
Participating Development Organizations:
Institute of Geophysics,China Earthquake Administration
Institute of Engineering Mechanics,China Earthquake Administration
Zhengzhou Research Institute of Mechanical Engineering Co.,Ltd.
China Electric Power Research Institute
Tongji University
North China Power Engineering Co.,Ltd.of China Power Engineering Consulting Group
East China Electric Power Design Institute of China Power Engineering Consulting Group
Chongqing University
Xi an XD Switchgear Electric Co.,Ltd.
Chief Drafting Staff:
Liu Mingqiu Zhu Xiaoli Lin Na Li Xiaojun Zhou Zhenghua
Liu Yumin Dai Zebing Xie Qiang Zhang Yuming Lu Zhicheng Ma Tuansheng
Zhao Jisheng Liu Qifang Pan Yangen Chen Zhenglun Li Yingmin
Yu Mingxing Tang Xianming Shi Dong Zhou Shuang Piao Changji
Chief Reviewing Staff:
Jia Cheng Tong Jianguo Zhang Fengmi Liu Xihui Yao Dekang Liu Houjian
Cao Meigen You Hongbing Zhao Fengxin Du Jiping Liu Kaihua Chen Zheng
Bao Yongzhong Liu Xiaorui Chen Qichun Li Guorong Zhou Jianjun
Xia Yingpu Zhong Xiyue Zhou Yu Zhang Runming Zhang Xijie Gu Pihua
Yan Guanxing Jiang Tao Zhang Ziping Zhang Xiaoxing Sui Guoxiu
- GB/T 50381-2018 城市軌道交通自動售檢票系統工程質量驗收標準
- GB 50388-2016 煤礦井下機車車輛運輸信號設計規范
- GB51005-2014水泥工廠余熱發電工程施工與質量驗收規范(英文版)
- GB/T 51338-2018 分布式電源并網工程調試與驗收標準
- GB50713-2011板帶精整工藝設計規范(英文版)
- 核電廠常規島儀表與控制設計規程
- GB/T51075-2015選礦機械設備工程安裝規范(英文版)
- GB50588-2017水泥工廠余熱發電設計標準(英文版)
- GB 51179-2016 煤礦井下煤炭運輸設計規范
- GB 51209-2016 發光二極管工廠設計規范
- GB/T50609-2010石油化工工廠信息系統設計規范(英文版)
- GB50060-20083~110kV高壓配電裝置設計規范(英文版)
- GB/T 51175-2016 煉油裝置火焰加熱爐工程技術規范
- GB50439-2015煉鋼工程設計規范(英文版)
- GB/T 51238-2018 巖溶地區建筑地基基礎技術標準