官术网_书友最值得收藏!

6 Main Building

6.1 General Requirements

6.1.1 The internal layout of main building shall be safe running and convenient operation,and patrol inspection channels shall be smooth.The ventilation,lighting,illumination and noise control and others of the main building shall meet the relevant requirements of the current national standards Design code for heating ventilation and air conditioning of industrial buildings GB 50019,Standard for daylighting design of buildings GB 50033,Standard for lighting design of buildings GB 50034 and Code for design of noise control of industrial enterprises GB/T 50087.

6.1.2 The main building shall be equipped with overhaul lifting facilities,overhaul site,and shall be set transport channel for overhaul of equipment and components.

6.1.3 The internal layout of workshop shall be determined by the professional design layout requirements for thermal-mechanical,electrical,civil,water,thermal control,heating and ventilation etc.,and the extension conditions.The reserved expanded workshop should be coordinated with the original workshop.

主站蜘蛛池模板: 永和县| 凌云县| 安塞县| 保定市| 仁化县| 石首市| 内江市| 亳州市| 新宾| 高阳县| 中牟县| 石景山区| 新和县| 贵州省| 光泽县| 长汀县| 巴彦县| 射洪县| 长岛县| 青川县| 永清县| 康马县| 仙游县| 临沂市| 富民县| 买车| SHOW| 海宁市| 潍坊市| 松溪县| 乌兰浩特市| 澄江县| 紫金县| 海南省| 泰州市| 柳林县| 古蔺县| 宁陵县| 永康市| 石河子市| 达孜县|